Laserfiche WebLink
�1-1[1 <br />J <br />r"I <br />lI'l <br />d-1 <br />r <br />C <br />C <br />L <br />0 <br />e <br />.s <br />i <br />0 <br />0 <br />EXHIBIT A <br />172nd Street Road Improvements <br />1 06/07 Exhibit A -1 03 -4197 <br />Bid <br />Item <br />Description <br />Estimated <br />Quanity <br />Unit <br />Unit <br />Price <br />Estimated <br />Total <br />I. <br />General <br />1 <br />Mobilzation per FDOT (< 5 %) <br />1 <br />LS <br />$50,000.00 <br />$50,000.00 <br />2 <br />Maintenance of Traffic per FDOT including temporary <br />striping and signage, barricades, barriers, arrow panels, <br />etc. as required. <br />1 <br />LS <br />$70,000.00 <br />$70,000.00 <br />3 <br />Clearing and Grubbing <br />1 <br />LS <br />$40,000.00 <br />$40,000.00 <br />4 <br />Pollution Prevention and Sediment Control <br />1 <br />LS <br />$5,000.00 <br />$5,000.00 <br />5 <br />Earthwork <br />1 <br />LS <br />$25,000.00 <br />$25,000.00 <br />6 <br />Relocation of existing mail box <br />1 <br />LS <br />$150.00 <br />$150.00 <br />General Subtotal <br />$190,150.00 <br />II. <br />Civil <br />A. <br />Demolition /Site Preparation <br />7 <br />Asphalt pavement demolition (removal & hauling) <br />4,936 <br />SY <br />$4.00 <br />$19,744.00 <br />8 <br />Concrete sidewalk demolition (removal & hauling) <br />1,210 <br />SY <br />$9.00 <br />$10,890.00 <br />9 <br />Catch basin to be abandoned in place and filled with <br />flowable flow <br />15 <br />CY <br />$100.00 <br />$1,500.00 <br />10 <br />Existing drainage pipes to be filled with flowable flow <br />80 <br />CY <br />$100.00 <br />$8,000.00 <br />11 <br />Relocate or adjust existing street signs. <br />3 <br />EA <br />$150.00 <br />$450.00 <br />B. <br />Paving <br />12 <br />1-1/2" Asphalt, type S -3 <br />550 <br />TN <br />$110.00 <br />$60,500.00 <br />13 <br />12" Stabilized subgrade <br />5,376 <br />SY <br />$10.00 <br />$53,760.00 <br />14 <br />8" Limerock <br />1,076 <br />CY <br />$60.00 <br />$64,560.00 <br />15 <br />4" Concrete sidewalk <br />1,522 <br />SY <br />$45.00 <br />$68,490.00 <br />16 <br />6" Concrete driveway <br />379 <br />SY <br />$65.00 <br />$24,635.00 <br />17 <br />Drop curb <br />422 <br />LF <br />$20.00 <br />$8,440.00 <br />18 <br />Type F curb and gutter <br />2,415 <br />LF <br />$20.00 <br />$48,300.00 <br />C. <br />Striping and Signs <br />19 <br />Thermoplastic STD white solid 6" <br />0.60 <br />NM <br />$3,000.00 <br />$1,800.00 <br />20 <br />Turn arrows <br />8 <br />EA <br />$100.00 <br />$800.00 <br />21 <br />RPM amber /amber <br />106 <br />EA <br />$5.00 <br />$530.00 <br />22 <br />RPM colorless /red <br />7 <br />EA <br />$5.00 <br />$35.00 <br />23 <br />R2 -1 24" x 30" speed limit sign <br />3 <br />EA <br />$300.00 <br />$900.00 <br />24 <br />R3 -5R Right turn lane sign <br />1 <br />EA <br />$300.00 <br />$300.00 <br />25 <br />R3 -51- Left turn lane sign <br />1 <br />EA <br />$300.00 <br />$300.00 <br />26 <br />6" Double yellow <br />0.60 <br />GM <br />$5,000.00 <br />$3,000.00 <br />27 <br />Pavement message (ONLY) <br />2 <br />EA <br />$120.00 <br />$240.00 <br />28 <br />133 -71- Left lane must turn left <br />2 <br />EA <br />$250.00 <br />$500.00 <br />29 <br />W1 -1 a ° Right turn lane and speed <br />1 <br />EA <br />$250.00 <br />$250.00 <br />30 <br />W1 -1a W Left turn and speed <br />1 <br />EA <br />$250.00 <br />$250.00 <br />31 <br />10' -30' Skip white line <br />0.30 <br />GM <br />$4,000.00 <br />$1,200.00 <br />1 06/07 Exhibit A -1 03 -4197 <br />