Laserfiche WebLink
a <br />EXHIBIT A <br />172nd Street Road Improvements <br />06/07 <br />S �y,+q S �� Jl I � - <br />Written <br />(dontractor) <br />Exhibit A -2 <br />"):)61 (Ii� — a 61t bb <br />(Date) <br />03 -4197 <br />Bid <br />Description <br />Estimated <br />Quanity <br />Unit <br />Unit <br />Price <br />Estimated <br />Total <br />3Item <br />'�., <br />_'t1r <br />D. <br />Drainage <br />32 <br />Ditch bottom inlet type "P" 3' -6' (Alternate A) <br />1 <br />EA <br />$3,000.00 <br />$3,000.00 <br />33 <br />Curb inlet (6) type "P" 3' -6' <br />8 <br />EA <br />$5,000.00 <br />$40,000.00 <br />34 <br />15" Yard drain by ADS <br />5 <br />EA <br />$1,700.00 <br />$8,500.00 <br />35 <br />15" HDPE pipe <br />486 <br />LF <br />$60.00 <br />$29,160.00 <br />36 <br />15" RCP <br />48 <br />LF <br />$70.00 <br />$3,360.00 <br />37 <br />18" RCP <br />385 <br />LF <br />$80.00 <br />$30,800.00 <br />38 <br />24" RCP <br />1,091 <br />LF <br />$90.00 <br />$98,190.00 <br />39 <br />Clean existing drainage well and core existing structure <br />1 <br />LS <br />$7,500.00 <br />$7,500.00 <br />40 <br />Sodding (St. Augustine) <br />3,350 <br />SY <br />$5.00 <br />$16,750.00 <br />Civil Subtotal <br />$616,634.00 <br />III. <br />Electrical <br />41 <br />Luminaires <br />14 <br />EA <br />$3,300.00 <br />$46,200.00 <br />42 <br />Liminaire poles <br />14 <br />EA <br />$3,300.00 <br />$46,200.00 <br />43 <br />PVC Conduit <br />3,000 <br />LF <br />$4.00 <br />$12,000.00 <br />44 <br />Copper wiring <br />3,000 <br />LF <br />$4.00 <br />$12,000.00 <br />45 <br />Trenching <br />3,000 <br />LF <br />$4.00 <br />$12,000.00 <br />46 <br />Backfill <br />3,000 <br />LF <br />$4.00 <br />$12,000.00 <br />47 <br />Luminaire wiring labor <br />14 <br />EA <br />$400.00 <br />$5,600.00 <br />48 <br />Luminaire mounting labor <br />14 <br />EA <br />$400.00 <br />$5,600.00 <br />Civil Subtotal <br />$151,600.00 <br />IV. <br />Landscape <br />49 <br />Landscape and irrigation (Allowance) <br />1 <br />LS <br />$108,500.00 <br />$108,500.00 <br />Total Contract Amount (Item I Thru IV) <br />$1,066,884.00 <br />06/07 <br />S �y,+q S �� Jl I � - <br />Written <br />(dontractor) <br />Exhibit A -2 <br />"):)61 (Ii� — a 61t bb <br />(Date) <br />03 -4197 <br />