My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1186
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1186
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:42:30 AM
Creation date
2/28/2008 2:50:29 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1186
Date (mm/dd/yyyy)
12/13/2007
Description
Heritage Park Parking Garage Agrmt w-Spillis Candela ($1,167,400.00)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />provided in the Contract Documents unless otherwise modified by written <br />instrument in accordance with Subparagraph (18). <br /> <br />(4) The Architect-Engineer shall provide periodic visits to the site as prescribed in <br />Exhibit "D" to be generally familiar with the progress and the general quality of <br />the Work and to determine in general if the Work is proceeding in accordance <br />with the Contract Documents. This Exhibit "D" by reference and attachment <br />hereto forms a part of this Agreement. On the basis of such on-site observations <br />of the Architect-Engineer, the Architect-Engineer shall keep the Owner informed <br />of the progress and the general quality of the Work, and shall endeavor to guard <br />the Owner against defects and deficiencies in the Work of the Contractor. <br /> <br />(5) The Architect-Engineer shall not have control or charge of and shall not be <br />responsible for construction means, methods, techniques, sequences or <br />procedures, or for safety precautions and programs in connection with the Work, <br />for acts or omissions of the Contractor, subcontractor or any other persons <br />performing any of the Work, or for failure of any of them to carry out the Work in <br />accordance with the Contract Documents. The Architect-Engineer shall not be <br />responsible for the Contractor. <br /> <br />(6) The Architect-Engineer shall at all times have access to the Work wherever it is in <br />preparation or progress. <br /> <br />(7) Based on the Architect-Engineer's observations at the site, the recommendations <br />of the Contractor and an evaluation of the Application for Payment, the Architect- <br />Engineer shall determine the amounts owing to the Contractor and shall issue a <br />Certificate of Payment in such amounts, as provided in the Contract Documents. <br /> <br />(8) The issuance of a Certificate for Payment shall constitute a representation by the <br />Architect-Engineer to the Owner, based on the Architect's observation at the site <br />and on the data comprising the Application for Payment. Work has progressed to <br />the point indicated; that, to the best of the Architect's knowledge, information and <br />belief, the quality of Work is in accordance with the Contract Documents (subject <br />to an evaluation of Work for conformance with the Contract Documents upon <br />Substantial Completion, to the results or any subsequent tests required by or <br />performed under the Contract Documents, to minor deviations from the Contract <br />Documents correctable prior to completion, and to any specific qualifications <br />stated in the Project Certificate for Payment); and that the Contractor is entitled to <br />payment in the amount certified. However, the issuance of a Certificate for <br />Payment shall not be a representation that the Architect-Engineer has made any <br />examination to ascertain how or for what purpose the Contractor has used the <br />monies paid on account of the Contract Sum. <br /> <br />(9) Should disagreement occur between the Contractor and Architect-Engineer over <br />acceptability of work and conformance with the requirements of the specifications <br /> <br />7 <br />C0708-026 Spillis Candcla & Parlllcrs. Inc. d/b/a Spill is Candela DMJM Agreement <br />
The URL can be used to link to this page
Your browser does not support the video tag.