Laserfiche WebLink
<br />and plans, the Project Director shall be the final judge of performance and <br />acceptability. <br /> <br />(10) All interpretations and decisions of the Architect-Engineer shall be consistent <br />with the intent of, and reasonably inferable from, the Contract Documents, and <br />shall be in writing or in graphic form. <br /> <br />(11) The Architect-Engineer's decision in matters relating to artistic effect shall be <br />final if consistent with the intent of the Contract Documents. The Architect- <br />Engineer's decisions on any other claims, disputes or other matters, including <br />those in question between the Owner and the Contractor, shall be subject to <br />claims provisions provided in this Agreement and in the Contract Documents. <br /> <br />(12) The Architect-Engineer shall recommend to the owner to reject work, which does <br />not conform to the Contract Documents. Whenever, in the Architect-Engineer's <br />reasonable opinion, it is necessary or advisable to insure conformance with the <br />provisions of the Contract Documents, the Architect-Engineer shall have authority <br />to require special inspection or testing of Work in accordance with the provisions <br />of the Contract Documents, whether or not such work be then fabricated, installed <br />or completed; but the Architect-Engineer shall take such action only after <br />consultation with the Contractor and Owner. <br /> <br />(13) The Architect-Engineer shall receive submittals such as Shop Drawings, Product <br />Data and Samples from the Contractor and shall review and approve or take other <br />appropriate action upon them, but only for conformance with the design concept <br />of the Project and with the information given in the Contract Documents. Such <br />action shall be taken with reasonable promptness so as to cause no delay. The <br />Architect-Engineer's approval of a specific item shall not indicate approval of an <br />assembly of which the item is a component. <br /> <br />(14) The Architect-Engineer shall review and approve or take other appropriate action <br />on Change Orders prepared by the Contractor for the Owner's authorization in <br />accordance with the Contract Documents. <br /> <br />(IS) The Architect-Engineer shall have authority to order minor changes in work not <br />involving an adjustment in a Contract Sum or an extension of a Contract Time <br />and which are not inconsistent with the intent of the Contract Documents. Such <br />changes shall be effected by written order issued to the Contractor endorsed by <br />the project director. <br /> <br />(16) The Architect-Engineer, assisted by the Contractor, shall conduct inspections to <br />determine the dates of substantial completion and final completion and shall issue <br />appropriate Certificates. <br /> <br />8 <br />C0708-026 Spillis Candcla & Partncrs. Inc. d/b/a Spill is Candcla DMJM Agreement <br />