My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1186
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1186
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:42:30 AM
Creation date
2/28/2008 2:50:29 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1186
Date (mm/dd/yyyy)
12/13/2007
Description
Heritage Park Parking Garage Agrmt w-Spillis Candela ($1,167,400.00)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />2.1 For his Basic Services prescribed in Article 3, Section 3.1 through 3.7.1 (18) hereinafter, <br />the lump sum amount of $1,167,400.00, to be paid as prescribed in Article 9.1 <br />hereinafter. <br /> <br />2.2 For Additional Services defined in Article 4 hereinafter to be paid as a Lump Sum, the <br />Lump Sum prescribed in the authorization. Exhibit "F" identifies allowances for <br />proposed additional services. <br /> <br />2.3 Reimbursable expense as defined in Article 8 hereinafter, not exceeding the limits of <br />Section 112.061 of the Florida Statutes. <br /> <br />ARTICLE 3 <br /> <br />ARCHITECT-ENGINEER'S BASIC SERVICES <br /> <br />3.1 THE ARCHITECT-ENGINEER AGREES TO PROVIDE BASIC PROFESSIONAL <br />SERVICES FOR THE PROJECT AS HEREINAFTER SET FORTH. <br /> <br />3.2 SCHEMATIC DESIGN PHASE <br /> <br />(1) The Architect-Engineer shall prepare, from the approved Programming Phase <br />Documents, the Schematic Design Studies for all components as necessary to <br />achieve a solution acceptable to the Owner. The Design Studies shall consist of <br />sketches, concepts, organization, orientation, relationship to existing and future <br />facilities, energy conservation approaches and equipment parameters necessary to <br />clearly define the general scope and direction of the project. <br /> <br />(2) The Architect-Engineer shall coordinate the development with the Contractor and <br />provide to the Owner a review and comments of the Contractor's estimates. <br /> <br />(3) The Architect-Engineer shall provide and distribute 10 hard (paper) copies and <br />one (1) electronic copy of the Schematic Design Studies Documents for review <br />and comment as directed by the project director. <br /> <br />3.3 CONSTRUCTION DOCUMENTS PHASE <br /> <br />(1) The Architect-Engineer shall prepare, from the approved Schematic Design Phase <br />Documents, Contract Documents consisting of Working Drawings and <br />Specifications and setting forth in detail the work. <br /> <br />(2) The non-technical documents consisting of the necessary bidding information, <br />General Conditions of the Contract, Supplementary General Conditions of the <br />Contract, Division One of the specifications, proposal and contract form shall be <br />prepared by the Contractor. The Architect-Engineer shall review and provide the <br />Owner his comments on these documents. Such documents shall not place any <br /> <br />3 <br />C0708-026 Spillis Candela & ParIncrs. Inc. d/b/a Spillis Candcla DMJM Agreement <br /> <br />---oil <br />
The URL can be used to link to this page
Your browser does not support the video tag.