My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1186
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1186
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:42:30 AM
Creation date
2/28/2008 2:50:29 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1186
Date (mm/dd/yyyy)
12/13/2007
Description
Heritage Park Parking Garage Agrmt w-Spillis Candela ($1,167,400.00)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />responsibility or obligation on the Architect-Engineer that are not already in this <br />contract. <br /> <br />(3) The Contract-Engineer shall provide and distribute 10 hard (paper) copies and one <br />(1) electronic copy of the Contract Documents for each Bid Group for review and <br />comment, including the non-technical documents, as directed by the project <br />director. <br /> <br />(4) Upon approval by the project director for the Contract Documents for each bid <br />group, the Architect-Engineer shall furnish to the Contractor prints of all drawings <br />and camera-ready copy of all specification data. <br /> <br />(5) The Architect-Engineer will provide the Owner with two copies of the documents <br />for each bid group, which shall be properly sealed and forwarded to the Project <br />Director. Copies of the Contract Documents for the Architect-Engineer's use will <br />be the responsibility of the Architect-Engineer. Upon approval of the Contract <br />Documents, the Architect-Engineer will furnish the Owner with 2 copies of the <br />CADD Documents as described in Article 3.6 (11) hereinbelow. <br /> <br />(6) The Architect-Engineer, consulting with the Construction Team, shall prepare <br />necessary addenda to each Bid Group and provide camera ready copy of each as <br />appropriate to the Contractor. All addenda, prior to distribution, shall be <br />approved by the Project Director. Copies of each addendum, properly sealed, <br />shall be forwarded to the Project Director. <br /> <br />(7) The Architect-Engineer shall provide Contract documents (Design Documents, <br />Specifications, etc.) which conform to applicable building codes (see Chapter <br />60D-7, Florida Administrative Code) and zoning codes and generally accepted <br />construction industry standards. <br /> <br />The Architect-Engineer shall signify his responsibility for the Contract <br />Documents prepared pursuant to this Agreement by affixing his signature, date <br />and seal thereto as required by Chapters 471 and 48 I, Florida Statutes. If the <br />facility being constructed meets the definition of a threshold building as defined <br />in Chapter 553.71 (7), Florida Statutes, then the Architect-Engineer shall insert the <br />following statement on each sheet required by Chapters 471 and 481, Florida <br />Statutes, to be signed, sealed and dated by the Architect-Engineer. <br /> <br />To the best of my knowledge, the plans, specifications and <br />addenda comply with the applicable minimum building <br />codes. <br /> <br />Where this Agreement provides for the Owner's approval of the Architect- <br />Engineer's design suggestions and decisions, such approval shall not relieve the <br />Architect-Engineer of any responsibility or warranty hereunder. <br /> <br />4 <br />C0708-026 Spillis Candcla & Pat1ncrs. Inc. d/b/a Spillis Canclela DMJM Agreement <br />
The URL can be used to link to this page
Your browser does not support the video tag.