Laserfiche WebLink
<br />Cross Sections <br />Traffic Control Notes <br />Traffic Control Plans <br />Signing and Marking Plans <br /> <br />44-91 <br />92 <br />93-97 <br />98-114 <br /> <br />9.5.2. In accordance with the indemnification prOVISIOn contained in the General <br />Conditions, the CONTRACTOR agrees to indemnify and save harmless the CITY OF <br />SUNNY ISLES BEACH, and BEISWENGER, HOCH AND ASSOCIATES Inc. and <br />their official agents and employees, from or on account of any injuries or damages <br />received or sustained by any person or person during or on account of any operations <br />connected with the construction of all Work; or by or in consequence of any negligence in <br />connection with the same; or by use of any improper materials or by or on account of any <br />act or omission of the said CONTRACTOR, subcontractor, agents, servants, or <br />employees; and <br /> <br />9.5.3. The CONTRACTOR agrees to maintain in force at all times during the life of the <br />construction, public liability insurance, by separate certificate, in an amount not less than <br />$1,000,000 for injuries, including willful death, to anyone person and subject to those <br />same limits for each person, in an amount not less that $1,000,000 for damages as a result <br />of each occurrence and property damage insurance and in an amount not less than <br />$1,000,000 for damages on anyone occurrence. Such policy shall specifically protect the <br />CITY OF SUNNY ISLES BEACH, and BEISWENGER, HOCH AND ASSOCIATES <br />Inc. their official agents and employees, by making them an additional insured, and shall <br />not be modified or canceled without thirty (30) days written notice to the CITY OF <br />SUNNY ISLES BEACH. <br /> <br />9.5.4 Should the final completion and acceptance of the work herein embraced together <br />with any modification or additions be delayed beyond the time herein set because of lack of <br />performance by the Contract, it is understood and agreed that aside from any other <br />liquidated damage per day for such delay from such time until the work is completed and <br />accepted as herein provided, all costs of engineering and inspection on behalf of the <br />OWNER will be charged to the CONTRACTOR and deducted from any estimate or <br />payment otherwise due and payable to him from time to time. The costs of engineering and <br />inspection which may be charged to the CONTRACTOR by the OWNER under this <br />article shall be equal to the Engineer's charges to the Owner. <br /> <br />IN WITNESS WHEREOF, OWNER and CONTRACTOR have signed this Agreement in <br />Five (5) parts. One counterpart each has been delivered to OWNER, CONTRACTOR and <br />ENGINEER. All portions of the Contract Documents have been signed, initialed or identified <br />by OWNER and CONTRACTOR or identified by ENGINEER on their behalf. <br /> <br />(The remainder oj this page has been intentionally left blank) <br /> <br />Southeastern Engineering Contractors, Inc. <br /> <br />-7- <br />