Laserfiche WebLink
<br />9.3. OWNER and CONTRACTOR each binds itself, its partners, successors, assigns <br />and legal representatives to the other party hereto, its partners, successors, assigns <br />and legal representatives in respect to all covenants, agreements and obligations <br />contained in the Contract Documents. <br /> <br />9.4. Any provisions or part of the Contract Documents held to be void or <br />unenforceable under any Law or Regulation shall be deemed stricken, and all <br />remaining provisions shall continue to be valid and binding upon OWNER and <br />CONTRACTOR, who agree that the Contract Documents shall be reformed to <br />replace such stricken provisions or part thereof with a valid and enforceable <br />provision that comes as close as possible to expressing the intention of the <br />stricken provision. <br /> <br />9.4.1 ARBITRATION: It is the intention of the parties that whenever possible, if a <br />dispute or controversy arises hereunder then such dispute or controversy shall be <br />settled by arbitration in accordance with the procedures, rules and regulations of <br />the American Arbitration Association. The decision rendered by the Arbitrator <br />shall be final and binding upon the parties and judgment upon the award rendered <br />by the arbitrator may be entered in any court having jurisdiction. Arbitration shall <br />be held in Miami-Dade County, Florida. All costs of arbitration and attorneys' <br />fees incurred by the parties shall be paid by the non-prevailing party or, if neither <br />party prevails on the whole, each party shall be responsible for a portion of the <br />costs of arbitration and their respective attorneys' fees as may be determined by <br />the court on confirmation. <br /> <br />9.5. OTHER PROVISIONS. <br /> <br />9.5,1. DRAWINGS <br /> <br />PROJECT NAME: Central Island Drainage and Street Improvements <br />Project No. <br /> <br />DESCRIPTION <br /> <br />SHEET NO. <br /> <br />Cover Sheet <br />Typical Sections <br />General Notes and Miscellaneous Details <br />Summary of Quantities <br />Survey Control Plan <br />Survey Control Points <br />Curve Data and Coordinates <br />Plan Layout <br />Plan and Profiles <br />Drainage Structures <br />Drainage Details <br />Pavement Core Results <br />Exfiltration Tests <br />Southeastern Engineering Contractors, Inc. <br /> <br />1 <br />2-4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11-37 <br />38-39 <br />40-41 <br />42 <br />43 <br /> <br />-6- <br />