Laserfiche WebLink
<br />rrubmittals. Each Sample will be identified clearly as to <br />material, Supplier, pertinent data such as catalog numbers, <br />and the use for which intended and otherwise as ENGINEER <br />may require to enable ENGINEER to review the submittal <br />for the limited purposes required by paragraph 6.17.E. The <br />numbers of each Sample to be submitted will be as specified <br />in the Specifications. <br /> <br />C. Where a Shop Drawing or Sample is required by the <br />Contract Documents or the schedule of Shop Drawings and <br />Sample submittals acceptable to ENGINEER as required by <br />paragraph 2.07, any related Work performed prior to <br />ENGINEER's review and approval of the pertinent submittal <br />will be at the sole expense and responsibility of <br />CONTRACTOR. <br /> <br />D. Submittal Procedures <br /> <br />1. Before submitting each Shop Drawing or Sample, <br />CONTRACTOR shall have determined and verified; <br /> <br />a. all field measurements, quantities, dimen- <br />sions, specified performance criteria, installation <br />requirements, materials, catalog numbers, and <br />similar information with respect thereto; <br /> <br />b. all materials willi respect to intended use, <br />fabrication, shipping, handling, storage, assembly, <br />and installation pertaining to the performance of the <br />Work; <br /> <br />c. all information relative to means, methods, <br />teclmiques, sequences, and procedures of construc- <br />tion and safety precautions and programs incident <br />thereto; and <br /> <br />d. CONTRACTOR shall also have reviewed <br />and coordinated each Shop Drawing or Sample with <br />other Shop Drawings and Samples and with the <br />requirements of the Work and the Contract Docu- <br />ments. <br /> <br />2. Each submittal shall bear a stamp or specific <br />written indication that CONTRACTOR has satisfied <br />CONTRACTOR's obligations under the Contract <br />Documents with respect to CONTRACTOR's review and <br />approval of that subminal. <br /> <br />3. At the time of each submittal, CONTRACTOR <br />shall give ENGINEER specific written DOtice of such <br />variations, if any, that the Shop: Drawing or Sample <br />submitted may have from the requirements of the <br />Contract Documents, such notice to be in a written com- <br />munication separate from the submittal; and, in addition, <br />shall cause a specific notation to be made on each Shop <br /> <br />00700 - 24 <br /> <br />Drawing and Sample submitted to ENGINEER for review <br />and approval of each such variation. <br /> <br />E, ENGINEER's Review <br /> <br />}, ENGINEER will timely review and approve <br />Shop Drawings and Samples in accordance with the <br />schedule of Shop Drawings and Sample submittals <br />acceptable to ENGINEER. ENGINEER's review and <br />approval will be only to determine if the items covered by <br />the submittals will, after installation or incorporation in <br />the Work, confonn to the information given in the <br />Contract Documents and be compatible with the design <br />concept of the completed Project as a functioning whole <br />as indicated by the Contract Documents, <br /> <br />2. ENGINEER's review and approval will nOI <br />extend to means, methods, techniques, sequences, or <br />procedures .of'constroction (except where a particular <br />means, method, technique, sequence, or procedure of <br />construction is specifically and expressly called for by the <br />Contract Documents) or to safety precautions or programs <br />incident thereto. The review and approval of a separate <br />item as such will not indicate approval of the assembly in <br />which the item functions. <br /> <br />3. ENGINEER's review and approval of Shop <br />Drawings or Samples shall not relieve CONTRACTOR <br />from responsibility for any variation from the require- <br />mentsof the Contract Documents unless CONTRACTOR <br />has in writing called ENGINEER's attention to each such <br />variation at the time of each submittal as required by <br />paragraph 6.17.D.3 and ENGINEER has given written <br />approval of each such variation by specific written <br />notation thereof incorporated in or accompanying the <br />Shop Drawing or Sample approval; nor will any approval <br />by ENGINEER relieve CONTRACfOR ,from <br />responsibility for. complying -with the requirements of <br />paragraph 6.17.D.1. <br /> <br />F. Resubmittal Procedures <br /> <br />1. CONTRACTOR shall make corrections required <br />by ENGINEER and shall return the required number of <br />corrected copies of Shop Drawings and submit as <br />required new Samples for review and approval. CON- <br />TRACTOR shall direct specific attention in writing to <br />revisions other than the corrections called for by ENGI- <br />NEER on previous submittals. <br /> <br />6.18 Cominuing the Work <br /> <br />r <br />A. CONTRACTOR shall carry on the Work and adhere <br />to the progress schedule during all disputes or disagreements <br />with OWNER. No Work shall be delayed or postponed <br />pending resolution of any disputes or disagreements, except <br />