<br />Olangc Directives, Field Orders, and written interpretations
<br />and clarifications in good order and annotated to show
<br />changes made during construction, These record documents
<br />together with all approved Samples and a counterpart of all
<br />approved Shop Drawings will be available to ENGINEER for
<br />reference. Upon completion of the Work, these record
<br />documents, Samples, and Shop Drawings will be delivered to
<br />ENGINEER for OWNER.
<br />
<br />6.13 Safety and PrOlection
<br />
<br />A. CONTRACTOR shall he solely responsible for
<br />initiating, maintaining and supervising all safety precautions
<br />and programs in connection with the Work. COJ'..'TRACTOR
<br />shall take all necessary precautions for the safety of, and
<br />shall provide the necessary protection to prevent damage,
<br />injury or loss to:
<br />
<br />I. all persons on lhe Site or who may be affected .
<br />by the Work;
<br />
<br />2. all the Work and materials and equipment to be
<br />incorporated therein, whether in storage on or off the
<br />Site; and
<br />
<br />3. other property at the Site or adjacent thereto,
<br />including trees, shrubs, lawns, walks, pavements,
<br />roadways, structures, utilities, and Underground Facilities
<br />not designated for removal, relocation, or replacement in
<br />the course of construction.
<br />
<br />B. CONTRACTOR shall comply with all applicable
<br />Laws and Regulations relating to the safety of persons or
<br />property. or to the protection of persons or property from
<br />damage, injury, or loss; and shall crect and maintain all
<br />necessary safeguards for such safety and protection.
<br />CON1RACI'OR shall notify owners of adjacent property and
<br />of Underground Facilities and other utility owners when
<br />prosecution of the Work may affect them. and shall cooperate
<br />with them in the protection, removal, relocation, and
<br />replacement of their property. All damage, injury, or loss to
<br />any property referred to in paragraph 6.13.A.2 or 6.13.A.3
<br />caused, directly or indirectly, in whole or in part, by CON-
<br />TRACTOR, any Subcontractor, Supplier, or any other
<br />individual or entity directly or indirectly employed by any of
<br />them to perform any of the Work, or anyone for whose acts
<br />any of them may .be liable, shall be remedied by
<br />CONTRACTOR (except damage or loss attributable to the
<br />fault of Drawings or Specifications or to the acts or
<br />omissions of OWNER or ENGINEER or ENGINEER's Con-
<br />sultant, or anyone employed by any of them, or anyone for
<br />whose acts any of them may be liable, and not attributable,
<br />directly or indirectly. in whole or in part, to the fault or
<br />negligence of CONTRACTOR or any Subcontractor,
<br />Supplier, or other individual or entity directly or indirectly
<br />employed by any of them). CONTRACTOR's duties and
<br />
<br />responsibilities for safety and for protection of the Work shall
<br />continue until such time as all the Work is completed and
<br />ENGINEER has issued a notice to OWNER' and
<br />CONTRACTOR in accordance with paragraph 14.07.B that
<br />the Work is acceptable (except as otherwise expressly
<br />provided in connection with Substantial Completion).
<br />
<br />6.14 Safety Represenuuive
<br />
<br />A, CONTRACTOR shall designate a qualified and
<br />experienced safety representative at the Site whose duties and
<br />responsibilities shall be the prevention of accidents and the
<br />maintaining and supervising of safety precautions and
<br />programs.
<br />
<br />6.15 Hazard Communiccuion Programs
<br />
<br />A. CONTRACTOR shall be responsible for coordinating
<br />any exchange of material'safety ,data sheets or other hazard
<br />communication information required to be made available to
<br />or exchanged between or among employers at the Site in
<br />accordance with Laws or Regulations.
<br />
<br />6.16 Emergencies
<br />
<br />A. In emergencies affecting the safety or protection of
<br />persons or the Work or property at the Site or adjacent
<br />thereto, CONTRACTOR is obligated to act to prevent
<br />threatened damage, injury, or loss. CONTRACTOR shall
<br />give ENGINEER prompt written notice if CONTRACTOR
<br />believes that any significant changes in the Work or
<br />variations from the Contract Documents have been caused
<br />thereby or are required as a result thereof. If ENGINEER
<br />determines that a change in the Contract Documents is
<br />required because of the action taken by CONTRACTOR in
<br />response to such an emergency, a Work Change Directive or
<br />Change Order will be issued.
<br />
<br />6:17S1wp Drawings and Samples
<br />
<br />A. CONTRACTOR shall submit Shop Drawings to
<br />ENGINEER for review and approyal in accordance with the
<br />acceptable schedule of Shop Drawings and Sample
<br />submittals. All submittals will be identified as ENGINEER
<br />may require and in the number of copies specified in the
<br />General Requirements. The data shown on the Shop
<br />Drawings will be complete with respect to quantities, dimen-
<br />sions, specified performance and design criteria, materials,
<br />and similar data to mow ENGINEER the services. materials,
<br />and equipment CONTR.ACTOR proposes to provide and to
<br />enable ENGINEER to review the information for the limited
<br />purposes required by paragraph 6.17.E.
<br />r
<br />
<br />B. CONTRACTOR shall also submit Samples to
<br />ENGINEER for review and approval iD. accordance with the
<br />acceptable schedule of Shop Drawings and Sample
<br />
<br />00700 - 23