My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2008-1221
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2008
>
Reso 2008-1221
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:42:35 AM
Creation date
3/17/2008 9:44:27 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2008-1221
Date (mm/dd/yyyy)
02/21/2008
Description
Southeastern - Central Island Drainage Proj Agrmt (Bid 07-10-02) ($3,635,852.02)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ARTICLE 7 - OTHER WORK <br /> <br />7.01 Relared Work at Sire <br /> <br />A. OWNER may perform other work related to the <br />Project at the Site by OWNER's employees, or let other <br />direct contracts therefor, or have other work performed by <br />utility owners. If such other work is not noted in the Con- <br />tract Documents, then: <br /> <br />I. written notice thereof will be given to CON- <br />TRACTOR prior to starting any such other work; and <br /> <br />2. if OWNER and CONTRACTOR are unable to <br />agree on entitlement to or on the amount or extent, if any, <br />of any adjustment in the Contract Price or Contract Times <br />that should be allowed as a result of such other work, a <br />Claim may be made therefor as provided in paragraph <br />10.05. <br /> <br />B. CONTRACTOR shall afford each other contractor <br />who is a party to such a direct contract and each utility owner <br />(and OWNER, if OWNER is performing the other work with <br />OWNER's employees) proper and safe access to the Site and <br />a reasonable opportunity for the introduction and storage of <br />materials and equipment and the execution of such other <br />work and shall properly coordinate the Work with theirs, <br />Unless otherwise provided in the Contract Documents, CON- <br />TRACTOR shall do all cutting, fitting, and patching of the <br />Work that may be required to prope~ly connect or otherwise <br />make its several parts come together and properly integrate <br />with such other work. CONTRACTOR shall not endanger <br />any work of others by cutting, excavating, or otherwise <br />altering their work and will pnIy cut or alter their work with <br />the written consent of ENGINEER and the others whose <br />work will be affected. The duties and responsibilities of <br />CONTRACTOR under this paragraph are for the benefit of <br />such utility owners and other contractors to the extent that <br />there are comparable provisions for the benefit of <br />CONTRACTOR in said direct contracts between OWNER <br />and such utility owners and other contractors. <br /> <br />C. If the proper execution or results of any part of <br />CONTRACTOR's Work depends upon work performed by <br />others under this Article 7, CONTRACTOR shall inspect <br />such other work and promptly report to ENGINEER in <br />writing any delays, defects, or deficiencies in such other <br />work: that render it unavailable or unsuitable for tlie proper <br />execution and results of CONTRAcroR's Work. <br />CONTRACTOR's failure -to so report will coristitute an <br />acceptance of such other work as fit :md proper for <br />integration with CONTRACTOR's Work except for latent <br />defects and deficiencies in such other work. <br /> <br />7.02 Coordination <br /> <br />A. If OWNER intends to contract with others for the <br />performance of other work on the Project at the Site, the <br />following will be set forth in Supplementary Conditions: <br /> <br />1. the individual or entity who will have authority <br />and responsibility for coordination of the activities among <br />the various contractors will be identified; <br /> <br />2. the specific matters to be covered by such <br />authority and responsibility will be itemized; and <br /> <br />3. the extent of such authority and responsibilities <br />will be provided. <br /> <br />B. Unless otherwise 'provided in the Supplementary <br />Conditions, OWNER shall have sole authority.and respon- <br />sibility for such coordination. <br /> <br />ARTICLE 8 - OWNER'S RESPONSIBILITIES <br /> <br />8.01 Communicarions to CorUracror <br /> <br />A. Except as otherwise provided in these General Condi- <br />tions, OWNER shall issue all conununications to <br />CONTRACTOR through ENGINEER. <br /> <br />8.02 ReplacemerU of ENGINEER <br /> <br />A. In case of termiIiation of the employment of ENGI- <br />NEER, OWNER shall appoint an engineer to whom <br />CONTRACfOR makes no reasonable objection., whose status <br />under the Contract Documents shall be that of the former <br />ENGINEER. <br /> <br />8.03 Furnish Data <br /> <br />A. OWNER shall promptly furnish the data required of <br />OWNER under the Contract Documents. <br /> <br />8.04 Pay Promptly When Due <br /> <br />A. OWNER shall make -payments to CONTRACTOR <br />promptly when they are due as provided in paragraphs <br />14.02.C and 14.07.C. <br /> <br />8.05 Lands and Easements; Reports and Tests <br /> <br />J{ OWNER's duties in respect of providing lands and <br />easements and providing engineering surveys to establish <br />reference points are set forth in paragraphs 4.01 and 4.05. <br />Paragraph 4.02 refers to OWNER's identifying and making <br />available to CONTRACI'OR copies of reports of explorations <br /> <br />00700 - 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.