My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2008-1221
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2008
>
Reso 2008-1221
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:42:35 AM
Creation date
3/17/2008 9:44:27 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2008-1221
Date (mm/dd/yyyy)
02/21/2008
Description
Southeastern - Central Island Drainage Proj Agrmt (Bid 07-10-02) ($3,635,852.02)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />and tests of subsurface conditions and drawings of physical <br />conditions in or relating to existing surface or subsurface <br />structures at or contiguous to the Site that have been utilized <br />by ENGINEER in preparing the Contract Documents, <br /> <br />8.06 Insurance <br /> <br />A. OWNER's responsibilities, if any, in respect to pur- <br />chasing and maintaining liability and property insurance are <br />set forth in Article 5. <br /> <br />8.07 Oumge Orders <br /> <br />A. OWNER is obligated to execute Change Orders as <br />indicated in paragraph 10.03. <br /> <br />8.08 Inspections, Tests, and Approvals <br /> <br />A, OWNER's responsibility in respect to certain inspec- <br />tioIlS, tests, and approvals is set forth in paragraph 13.03,8. <br /> <br />8.09 Limitations on OWNER's Responsibilities <br /> <br />A. The OWNER shall not supervise, direct, or have <br />control or authority over, nor be responsible for, <br />CONTRACTOR's means, methods, teclmiques, sequences, <br />or procedures of construction, or the safety precautions and <br />programs incident thereto, or for any failure of CON- <br />TRACTOR to comply with Laws and Regulations applicable <br />to the performance of the Work. OWNER will not be <br />responsible for CONTRACTOR's failure to perform the <br />Work in accordance with the Contract Documents. <br /> <br />8.10 Undisclosed Hazardous Environmental Condition <br /> <br />A. OWNER's responsibility in respect to an undisclosed <br />Hazardous Environmental Condition is set forth in paragraph <br />4.06. <br /> <br />8.11 Evid~nce of Financial Arrangements <br /> <br />A. If and to the extent OWNER has agreed to furnish <br />CONTRACTOR reasonable evidence that fmandal <br />arrangements have been made to satisfY OWNER's <br />obligations under the Contract Documents, OWNER's <br />responsibility in respect thereof will be as set forth in the <br />Supplementary Conditions. <br /> <br />ARTICLE 9 - ENGINEER'S STATUS DURING <br />CONSTRUCTION <br /> <br />9.0] OWNER'S Representative <br /> <br />A. ENGINEER will be OWNER's representative during <br />the construction period. The duties and responsibilities and <br />the limitations of authority of ENGINEER as OWNER's <br />representative during construction are set forth in the <br />Contract Documents and will not be changed without written <br />consent of OWNER and ENGINEER. <br /> <br />9.02 VisilS to Site <br /> <br />A. ENGINEER will make visits to the Site at intervals <br />appropriate to the various stages of construction as <br />EN G INEER deems necessary. in order to observe as an <br />experienced and qualified' design professional the progress <br />that has been made and the quality of the various aspects of <br />CONTRACTOR's executed Work. Based on information <br />obtained during such visits and observations, ENGINEER, <br />for the benefit of OWNER, will determine, in general, if the <br />Work is proceeding in accordance with the Contract <br />Documents. ENGINEER will nOI be required to make <br />exhaustive or continuous inspections on the Site to check the <br />quality Of quantity of the Work. ENGINEER's efforts will <br />be directed toward providing for OWNER a greater degree <br />of confidence that the completed Work will conform <br />generally to the Contract Documents. On the basis of such <br />visits and observations, ENGINEER will keep OWNER <br />informed of the progress of the Work and will endeavor to <br />guard OWNER against defective Work. <br /> <br />B, ENGINEER's visits and observations are subject to <br />all the limitations on ENGINEER's. authority and <br />responsibility set forth in paragraph 9.10, and particularly, <br />but withomlimitation.,.during or.-as a result of ENGINEER's <br />visits or observations of CONTRACTOR's Work <br />ENGINEER will not. supervise, direct, control, or have <br />authority over or be responsible for CONTRACTOR's <br />means, methods, techniques, sequences'7 or procedures of <br />construction, or the safety precautions and programs incident <br />thereto, or for any failure of CONTRACTOR to comply with <br />Laws and Regulations applicable to the performance of the <br />Work. <br /> <br />9.03 Project Representative <br /> <br />A. If OWNER and ENGINEER agree, ENGINEER will <br />furnish a Resident Project Representative to ~ist <br />ENqINEER in providing more extensive observation of the <br />Work. The responsibilities and authority and limitations <br />thereon of any such Resident Proj~ Representative and <br />assistants will be as provided in paragraph 9.10 and in the <br />. Supplementary Conditj~ns. If OWNER designates another <br /> <br />00700 - 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.