Laserfiche WebLink
<br />Ms, Kathryn O'Leary Richards <br />March l8, 2008 <br />Page 2 of2 <br /> <br />Survey crew <br />Survey Technician <br />Professional Land Surveyor <br /> <br />7 days @ $1 , 115 per day <br />24 hours @ $ 85 per hour <br />8 hours @ $ 110 per hour <br /> <br />$7,805.00 <br />$2,040.00 <br />$ 880.00 <br /> <br />Soft digs to detem1ine underground utilities of the area where proposed Date Palms are located <br />on east and west side of southbound Collins Ave. will be performed at a later date. The number <br />and locations are also to be determined. Soft dig costs vary from $250.00 per location for soft <br />surfaces such as grass or dirt to $400.00 per location for surfaces such as concrete or asphalt. <br /> <br />The soft dig locations will need to be surveyed in aller completion. Our survey fee for this <br />portion of the project will be billed on an hourly basis. <br /> <br />To the maximum extent permitted by law, the Client agrees to limit Aylward Engineering & <br />Surveying, Inc.'s liability for the Client's damages to the amount of this contract. This limitation <br />shall apply regardless of the cause of action or legal theory pled or asserted. <br /> <br />Please sign this proposal in the space provided to approve this fee proposal and authorize the <br />work. Please call me if you have any questions regarding this matter. <br /> <br />.?incerely, ,/" <br /> <br />/\ r; <br />I \ .?I //, /'1' <br />~ .' "",",. ./ 1'1 / v <br />~/.!1t2tf6'C~u./It()~C2 LtC (~-Lfro . <br />,// S~tron AYlw.,a.J~~x, P.E., P.L.S. <br />I ' <br />,~/ <br /> <br />Approved: <br />Date: <br />