My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2008-1245
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2008
>
Reso 2008-1245
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:42:37 AM
Creation date
6/9/2008 11:06:39 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2008-1245
Date (mm/dd/yyyy)
03/20/2008
Description
1st Addendum to Lukes Landscape Maintenance Agrmt ($94,167.04)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Lukes-Sawgrass Landscape <br /> <br />Irrigation Division <br />2200 N. 30th Road <br />Hollywood, FL 33021 <br />(954)962-5018 Fax: (954)926-2620 <br />Dade: 03P000298 Broward: 87-CLS-463-X State: 2989 <br /> <br />Estimate <br /> <br />DATE <br /> <br />ESTIMATE NO. <br /> <br />2/29/2008 <br /> <br />E-1885 <br /> <br />NAME / ADDRESS <br /> <br />JOB AT <br /> <br />Lukes-Sawgrass Landscape <br />2200 N, 30th Road <br />Hollywood, FL 33021 <br /> <br />Sunny Isles Beach <br />Center islands of Winston Blvd <br />from Collins Ave west to end <br />Sunny Isles Beach, FL <br /> <br />P.O. NO. TERMS PROJECT <br />Due on receipt Winston Blvd center islands <br />DESCRIPTION QTY COST TOTAL <br />Install four new sprinkler systems from four existing meters and backflows in the thirteen center <br />islands on Winston Blvd from Collins Avenue west to the end. The new system will include zones <br />for the existing flower beds at the ends of the islands. As the flowers require more water than the <br />plants and sod, being able to water the flower beds only will reduce water usage and conserve water. <br />We will utilize the existing city water meters, PVB backflow devices, and the sleeves under the <br />asphalt between the islands. The existing PVC pipe in the sleeves will be replaced as needed. The <br />existing control valves and battery operated controllers will be replaced. During the installation, we <br />will install conduit for upgrading the control wiring in the future. <br />Materials needed to install TORO 570 - 4" pop-up/shrub riser spray heads or equal 232 19.22 4,459.04T <br />Materials needed to install TORO 570-12" pop-up spray heads or equal 80 30.40 2,432.00T <br />Ft. 2" Sch. 40 PVC main line 1,500 1.12 1,680.00T <br />Ft. 1" PVC Conduit 1,500 0.88 1,320.00T <br />Ft. 1" P.R. 160 PVC zone main 2,100 0.37 777.00T <br />TORO 1-112" 220 series plastic 24V control valve and misc installation materials 9 164.00 1,476.00T <br />TORO I" 220 series plastic 24V control valve and misc installation materials 17 120.00 2,040.00T <br />Rainbird TBOS 2-station battery operated control module 13 271.00 3,523.00T <br />Labor to install TORO 570 - 4" pop-up/shrub riser spray heads or equal 232 30.00 6,960.00 <br />Labor to install TORO 570 - 12" pop-up spray heads or equal 80 32.50 2,600.00 <br />Labor to install main line and conduit 1,500 1.25 1,875.00 <br />Labor to install zone main 2,100 0.50 1,050.00 <br />Labor to install control valves 26 150.00 3,900.00 <br />Labor to install TBOS control units 13 20.00 260.00 <br />Sales Tax Exempt - requires sales tax number 0.00% 0.00 <br />Please sign and return by fax. Thank you! TOTAL <br /> $34,352.04 <br />This is a T &M estimate. All quantities listed herein are estimated. The final invoice will reflect the materials and labor required to complete <br />the work as listed on the daily job tickets signed at the end of each day by a representative of the property. <br /> <br />PRThfT NAME <br />AND TITLE <br /> <br />SIGNATURE <br />
The URL can be used to link to this page
Your browser does not support the video tag.