Laserfiche WebLink
<br />Sunny Isles - A TT BICS WIFI pole and electrical work BID 03-13-2008 <br />Rev 3.docSunny Isles - ATT BICS WIFI pole and electrical work BID 03-13-2008 Rev 3.doc <br /> <br />2. Provide and install one (1) wall mounted 15ft mast and one (1) wall mounted 5ft mast at <br />city hall roof. <br />3. Install two (2) antennas at City Hall roof location and one (1) antenna at Golden Shores <br />Park and One (1) at Bella Vista Park. <br />4. Install two (2) APs onto existing city owned electrical poles located at Pier Park. <br />5. Install two (2) wall mounted APs at Sampson Park. <br />6. Install one (1) AP onto existing city owned light pole located at Public Works parking lot. <br />7. All poles shall be installed with a precast concrete base. <br />8. Provide and install 120V power outlets feeding antennas and APs excluding outlets <br />located at city hall roof (to be done by others). <br />9. City of Sunny Isles is to remove and restore landscape materials, fencing and/or any <br />obstruction where required to safely access work area. <br />10. All pole locations must be identified by AT&T with concurrence from City of Sunny <br />Isles prior to project commencement and pending public underground locator clearance <br />to be performed by Sunshine Locators. <br />11. AT&T is to supply all antennas, access points and mounting hardware required for <br />project completion. <br />12. A TT is to provide all safety traffic cones and barricades were needed. <br />13. Pricing includes all labor and materials required for project completion. <br />14. Provide wind load certification. (Additional engineering charges may apply if City of <br />Sunny Isles requests wall composition for roof mast install). <br />15. It is assumed all locations have sufficient power. <br />16. Pole manufacturer will not commit to delivery date until firm order has been placed, <br />(normally is four to six weeks). <br />17. It is assumed existing conduits (Pier Park) are in good working condition. <br />18. A TT and our installation contractor Meisner Datacom will abide by the City Of Sunny <br />Isles Beach Wireless Island Network Services Agreement with AT&T Business Systems <br />for Completion of Phase 1 of the Wireless Island. <br /> <br />Proiect Notes <br />1) Golden Shores Park: Pole to be located at NE comer of park near retammg wall, <br />approximately. 150 ft trench to existing electrical panel. Trenching may encounter roots <br />of hedge line. <br />2) Public Works Bldg: Utilize existing parking-lot poles, assume need to pull constant hot <br />circuit through existing raceway, shall be a temp installation for approximately 2 years <br />during construction of new public works bid. <br />3) Margolis Park: Pole to be located on each side of park near center, approximately. 50 ft <br />trench to existing electrical panel. <br />4) Town Center Park: Pole to be located just east of existing Gazebo structure, trench <br />approximately 30 ft to existing junction box at Gazebo, pull approximately 175-200 ft <br />through existing raceway to electrical panel. <br />5) Vista Park: Pole to be located just north of roadway overpass at east edge of parking <br />area, trench approximately. 75 ft to existing electrical panel, landscape materials to be <br />removed by city prior to trenching. <br /> <br />The information contained in this proposal is proprietary to A TT and is offered solely for the purpose of evaluation. <br />It may not be disclosed to third parties without prior written permission from A TT. Page 2 of 5 <br />