My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2008-1231
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2008
>
Reso 2008-1231
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:42:39 AM
Creation date
6/12/2008 3:54:31 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2008-1231
Date (mm/dd/yyyy)
02/21/2008
Description
AT&T Agrmt for Phase I WiFi ($242,115.00)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Sunny Isles - A TT SICS WIFI pole and electrical work BID 03-13-2008 <br />Rev 3.docSunny Isles - A TT SICS WIFI pole and electrical work BID 03-13-2008 Rev 3.doc <br /> <br />6) Pier Park: Qty (2) Access Point Devices, One mounted to existing light pole at parking <br />lot entrance, and second one located on another existing light pole at utility building near <br />beach entrance, will need to pull additional constant hot circuit through Qty 8 - 10 <br />existing light poles to electrical panel, each pole spaced approximately 40 ft. <br />7) Ocean Front Sampson Park: Qty (2) Access Point Devices, One mounted to existing <br />restroom building near beach, power available at vending machine area of building & on <br />rooftop, and second one located near roadway at northwest corner, pole to be located near <br />fence behind existing flagpole area, trench approximately 30 ft to junction box, assume <br />existing circuit available for use. <br />8) City Hall: Install 15 ft mast to side of existing block wall near others, utilize existing <br />weatherhead/raceway and electrical circuit at roof. Second access point to be located at <br />Southeast corner of roof, electrical circuit shall be installed by others to existing outlet <br />located on North side of roof. <br /> <br />Specifications / Testing / Documentation / Provided Services: <br />· This scope of work is based on 8-hour shifts commencing after 7:00 AM, Monday <br />through Friday, excluding holidays observed. <br />· It is assumed that A TT installers and authorized subcontractors will have ready access <br />after notification to all areas necessary to complete scope of work. <br />· Project Manager and Single Point of Contact, (SPOC), shall be assigned during and post <br />implementation until project is completed. <br />· All work will be performed in accordance with local codes governing the installation of <br />new wire and cable used for electrical and/or communications purposes. If no local code <br />exists, pertinent sections of the National Electrical Code of 2008 will be observed. <br />. All materials shall be UL listed and approved. <br /> <br />General Contingencies: <br />The following items are not included in this price quote: <br />· Replacement and/or removal of any existing defective or unused cable, material or <br />equipment. <br />. Patch cords of any kind. <br />. A TT demarcation cable. <br />· A TT is not responsible for the integrity of existing building structures. <br />. Lightning protection <br />. Plywood backboards. <br />. Wall penetration sleeves. <br />. Engineering, drawings and or/design fees. <br />. Low voltage permit fee. <br />. Active electronics. <br />. Accelerated schedule. <br />. Ground restoration. <br /> <br />The information contained in this proposal is proprietary to A IT and is offered solely for the purpose of evaluation. <br />It may not be disclosed to third parties without prior written permission from A IT. Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.