My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2008-1301
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2008
>
Reso 2008-1301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2016 11:21:17 AM
Creation date
10/7/2008 10:10:18 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2008-1301
Date (mm/dd/yyyy)
07/17/2008
Description
Tenex Bid & Agrmt for Atlantic Isles Roadway & Utility Improv ($2,885,048.00)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ISECTION 00800 <br />IFIRST AMENDED SUPPLEMENTARY CONDITIONS <br />The following supplements modify, change from or add to the Standard General Conditions of <br />' the Construction Contract, EJCDC Document 1910 -8, 1996 Edition. Where any Article of the <br />General Conditions is modified or any Paragraph, Subparagraph or Clause thereof is modified <br />or deleted by these supplements, the unaltered provisions shall remain in effect. <br />ARTICLE 1 - DEFINITIONS AND TERMINOLOGY <br />Add the following sentence to Paragraph 1.01.28 entitled "Notice of Award ": <br />"When requested by OWNER, the Notice of Award may be issued by the <br />ENGINEER." <br />Add the following sentence to Paragraph 1.01.29 entitled "Notice to Proceed ": <br />"When requested by OWNER, the Notice to Proceed may be issued by <br />ENGINEER." <br />Add the following terms after Paragraph 1.01 50: <br />1.51 ARCHITECT /ENGINEER - The person, firm or corporation named as the <br />ENGINEER in the Agreement. <br />1.52 Provide - As used in the Project Manual, means to furnish and install, <br />complete and ready for intended use. <br />1.53 Product - As used in the Project Manual, includes materials, fabrications, <br />systems and equipment. <br />1.54 Project Manual - The volume of written construction documents, including <br />the Bidding Documents, sample forms, and the Contract Documents, such as the <br />Conditions of the Contract and the Specifications. <br />1.55 Retainage — The percentage of the Contract Price, retained by Owner from <br />' the progress payments to the Contractor for Work performed until the Work is <br />completed. It shall be payable to Contractor in accordance with the Contract <br />Documents. <br />ARTICLE 2 - PRELIMINARY MATTERS <br />' Add the following to Paragraph 2.01: <br />"If the Work is to be commenced prior to execution of the Agreement in response <br />to a letter of intent, CONTRACTOR shall, prior to commencement of the Work, <br />submit evidence satisfactory to OWNER that such bonds will be furnished." <br />1 <br />t05/08 Final Version 00800 -1 05 -4893 <br />
The URL can be used to link to this page
Your browser does not support the video tag.