My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2008-1301
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2008
>
Reso 2008-1301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2016 11:21:17 AM
Creation date
10/7/2008 10:10:18 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2008-1301
Date (mm/dd/yyyy)
07/17/2008
Description
Tenex Bid & Agrmt for Atlantic Isles Roadway & Utility Improv ($2,885,048.00)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a flagman at all times. After 5:00 p.m. and you are finished for the day, make sure it is <br />accessible as well as to the houses. <br />20. What are the hours for noise? <br />City Ordinance is from 7:00 a.m. to 7:00 p.m. Monday through Friday, 9:00 a.m. to <br />5:00 p.m. on Saturday, and no Sundays or Holidays. City can make some extensions. <br />21. Allowances for bringing in materials? <br />We have DOT fabric, we calculated that on -line items but we will check and add to <br />Addendum. <br />22. Testing? <br />We are going to concentrate more on the sewer to make sure it has a good bedding. <br />Road wise, that road has been there a while, so hopefully it is already pretty well <br />compacted except the widening of the roads because of the curbing. <br />23. Do you have definitions as far as how deep. <br />We are still debating but about 3 -feet. <br />24. Trench as well? <br />Just for the <br />25. Do you have a special Control Plan for the middle while we are working there? <br />Fence around it. <br />26. Staging area? <br />Yes. <br />27. Coding for the lift station and the manholes, any special liner? <br />Everything regarding the sewer is based on Miami -Dade Water and Sewer Standards, <br />so just follow that. <br />28. Compaction testing is the contractor's responsibility and we have to pay for them according <br />to contract documents? <br />Yes, any type of testing that needs to be submitted signed and sealed by your lab, and <br />should be included in your costs. <br />29. Do you want per lift on the base, three for every 1,000 feet, two- tiers, sub -base will be <br />expensive. <br />Yes, we will confirm exactly how many tests we are looking for. <br />30. What is the holiday schedule? <br />City Hall is closed on all regular holidays with the exception of Columbus Day which <br />falls on October 1P this year, and we are closed on the day after Thanksgiving as well. <br />I <br />1 08 -06 -01 Pre -Bid Conference QA Page 4 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.