My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2008-1301
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2008
>
Reso 2008-1301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2016 11:21:17 AM
Creation date
10/7/2008 10:10:18 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2008-1301
Date (mm/dd/yyyy)
07/17/2008
Description
Tenex Bid & Agrmt for Atlantic Isles Roadway & Utility Improv ($2,885,048.00)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
31. Pipe trench envelopes, you had talked about 6- inches below, is that as far as you are looking <br />for mucking, or do we need to go beyond that? <br />The specs will state that, usually the pipes go down until you find the material. <br />32. What is the definition, just until you find the muck/material? <br />We will define what the worst scenario will be for us and add to the Addendum. <br />33. Are there any wells? <br />No. <br />All the designs, permits will be placed by the time of the bid opening (June 16, 2008), <br />the contractor is going to be responsible for any additional cost of permits, you need to <br />get your dewatering permits, etc., and so it is the contractor's responsibility to obtain it <br />and pay for it, so those fees should be included. <br />34. Will those fees be reimbursed by the City? <br />No, you need to put it in you number. <br />35. Sprinklers on Collins Avenue, Manhole, is that a DOT right -of -way? <br />' Yes, and the City will apply for the special permit for connection, but it will be the <br />contractor's responsibility for the MOT on lane closures, etc. <br />' 36. Do you have to be prequalified by DOT to do that work? <br />No. <br />r37. Do we attach that force main to the outside of bridge? <br />It will be a terminating manhole prior to WASA's existing manhole, it is a drop <br />' manhole. <br />3 8. Do you have to go over the bridge? <br />' Yes. The pipe will be on top of the deck. There is a detail in plans. <br />39. Inside or outside of wall? <br />' Outside. <br />40. Can we get trucks and equipment over the bridge? <br />Everything is okay for those two front bridges. The only bridge that you can't use is <br />the interior small bridge that goes over the little lagoon, it is historic. Do not touch it. <br />41. Pump station, lift. <br />We are still in the process of application for the lift station. County standards need to <br />be followed. <br />42 F WA SA we have to have roof of bills before starting the countdown on delivery, can you <br />For W S e p g rY Y <br />' accelerate that process? <br />Yes, we have turn around in about a week. <br />1 08 -06 -01 Pre -Bid Conference QA Page 5 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.