My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2008-1301
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2008
>
Reso 2008-1301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2016 11:21:17 AM
Creation date
10/7/2008 10:10:18 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2008-1301
Date (mm/dd/yyyy)
07/17/2008
Description
Tenex Bid & Agrmt for Atlantic Isles Roadway & Utility Improv ($2,885,048.00)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />SECTION 00900 <br />' Addendum No. 4 <br />to <br />Contract documents <br />CITY OF SUNNY ISLES BEACH <br />Atlantic Isles Roadway and Utility Improvements <br />CGA PROJECT NO. 05 -4893 <br />CITY BID NO. 08 -06 -01 <br />To All Bidders: <br />Bidders for the above - referenced project shall take note of the following changes, <br />' additions, deletions, clarifications, etc. to the Plans and Specifications, which in <br />accordance with the Contract Documents shall become a part of and have precedence <br />over anything shown or described otherwise. <br />' IN THE CONTRACT DOCUMENTS: <br />' 1. In Document 00020, change the bid opening date to Monday, July 7, 2008. <br />This is to change the date for receiving and opening of bids. Sealed bids will be <br />received by the City Clerk until 11:30 am on Monday, July 7, 2008 and after that <br />time bids will be opened and read aloud. <br />' 2. In Document 00300 and Document 00500, change contract time from 170 <br />calendar days to 240 calendar days. <br />' 3. In Document 00300 and Document 00500, change to read "The Owner agrees, <br />as a bonus for each calendar day of early completion before 200 calendar days <br />of notice to proceed, the amount of $2,000.00 per calendar day. The bonus is <br />' limited to a maximum of $60,000.00 ". <br />4. In the Geotechnical Report that was included in Addendum No. 3, add the <br />' following disclaimer "Soil borings are for reference only and are not intended to <br />represent all soil conditions which may be encountered on this project. In all <br />cases, the contractor shall provide suitable pipe bedding and backfill in <br />' accordance with contract documents and Miami Dade Water and Sewer <br />standards and specifications for sanitary sewer; FDOT for drainage collection <br />system; City of North Miami for the water distribution system ". <br />All other documents, specifications, drawings, terms and conditions remain the same. <br />Bidders must acknowledge receipt of Addendum on Page 00300 -7. <br />I END OF SECTION <br />06/08 00900 -1 05 -4893 <br />
The URL can be used to link to this page
Your browser does not support the video tag.