My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2008-1301
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2008
>
Reso 2008-1301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2016 11:21:17 AM
Creation date
10/7/2008 10:10:18 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2008-1301
Date (mm/dd/yyyy)
07/17/2008
Description
Tenex Bid & Agrmt for Atlantic Isles Roadway & Utility Improv ($2,885,048.00)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EJCDC <br />STANDARD FORM OF AGREEMENT <br />BETWEEN OWNER AND CONTRACTOR <br />ON THE BASIS OF A STIPULATED PRICE <br />THIS AGREEMENT is dated as of the day of in the year 20_ by and between <br />' CITY OF SUNNY ISLES BEACH (hereinafter called OWNER) and Tenex Enterprises, Inc. <br />(hereinafter called CONTRACTOR). <br />' OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as <br />follows: <br />' Article 1. WORK. <br />CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Work <br />' is generally described as follows: <br />Atlantic Isles Roadway and Utility Improvements <br />construction of sanitary sewer collection system with gravity sewer lines manholes, WASD lift station <br />and force main: paving grading and drainaoe improvements: under grounding of certain utilities such as <br />' FPL power, CATV and telephone The installation of a new water main with services is also proposed by <br />the City of North Miami Beach to be constructed contemporaneously, but not currently in this contract. <br />Article 2. ENGINEER. <br />The Project has been designed by: <br />Calvin, Giordano & Associates, Inc. <br />1800 Eller Drive, Suite 600 <br />Fort Lauderdale, FL 33316 <br />(954) 921 -7781 <br />who is hereinafter called ENGINEER and who is to act as OWNER'S representative, assume all duties <br />and responsibilities and have the rights and authority assigned to ENGINEER in the Contract Documents <br />in connection with completion of the Work in accordance with the Contract Documents. <br />Article 3. CONTRACT TIMES. <br />3.1. The Work will be substantially completed within 230 calendar days after the date when the <br />Contract Times commence to run completed and ready for final payment in accordance with <br />paragraph 14.07 of the General Conditions within 240 calendar days after the date when the <br />Contract Times commence to run. <br />' 3.2. LIQUIDATED DAMAGES. OWNER and CONTRACTOR recognize that time is of the essence <br />of this Agreement and that OWNER will suffer financial loss if the Work is not completed within the <br />' times specified in paragraph 3.1 above, plus any extensions thereof allowed in accordance with <br />Article 12 of the General Conditions. They also recognize the delays, expense and difficulties <br />in Ived in proving the actual loss suffered by OWNER if the Work is not completed on time. <br />Ac rdingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as <br />' ��� uidated damages for delay (but not as a penalty) CONTRACTOR shall pay OWNER �ws <br />for each day that expires after the time specified in <br />paragraph "fob each Substantial Com letion date until the Work is substantially complete. If +� <br />0ItQv 1 CONTRAC II neglect, refuse or fai complete the project by the project completion date <br />3� On°' OJ ) within the ti cified in pars r 1 for ompletion and readiness for final payment or a a �r <br />/ proper exterlis -o-a -- thereof gran d , CONTRACTOR shall pay OWNER-,Two Thousand <br />and 00/100 dollars or each;,�da t t expires after the time specified in paragraph 3.1 for <br />' completion and readiness for final pay��' <br />' 05/08 Final Version 00500 -1 - 5-4893 <br />
The URL can be used to link to this page
Your browser does not support the video tag.