Reso 2008-1301
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2008
>
Reso 2008-1301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2016 11:21:17 AM
Creation date
10/7/2008 10:10:18 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2008-1301
Date (mm/dd/yyyy)
07/17/2008
Description
Tenex Bid & Agrmt for Atlantic Isles Roadway & Utility Improv ($2,885,048.00)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1�* <br />3.3. EARLY COMPLETION' BONUS. if CONTRACTOR Gempletes the VVeFk pFi9F to 20 <br />1 <br />GaleRdaF Days, the CONTRACTOR will be eligible to FeGeive aR eaFly GOMpletiOn bORUS OR the <br />�— <br />to 200 hURdFed GaleRdar days, up to a maximum arneunt ef S;xty Thousand and 001100 ' ($6A- 990.04Y <br />Article 4. CONTRACT PRICE. <br />' OWNER shall pay CONTRACTOR for completion of the Work in accordance with the Contract <br />Documents an amount in current funds equal to the sum of the amounts determined pursuant to <br />' paragraphs 4.1 below: <br />4.1. FOR A LUMP SUM CONTRACT OF: <br />' TOTAL BASE BID (Lump sum, Unit prices, and contingency items) <br />Two Million Eight Hundred Eighty Five Thousand Forty Eight Dollars and cero cents <br />' (use words) ($ 2,885,048.00) <br />figures <br />As provided in paragraph 11.03 of the General Conditions estimated quantities are not guaranteed, and <br />' determinations of actual quantities and classification are to be made by ENGINEER as provided in <br />paragraph 9.08 of the General Conditions. Unit prices have been computed as provided in paragraph <br />11.03.13 of the General Conditions. <br />' Article 5. PAYMENT PROCEDURES. <br />CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General <br />' Conditions. Applications for Payment will be processed by ENGINEER as provided in the General <br />Conditions. <br />' 5.1. Progress Payments; Retainage. OWNER shall make progress payments on account of <br />the contract Price on the basis of CONTRACTOR's Applications for Payment as recommended by <br />ENGINEER, on or about the last day of each month during construction as provided in paragraphs <br />5.1.1. and 5.1.2. below. All such payments will be measured by the schedule of values established <br />' in paragraph 2.07 of the General Conditions (and in the case of Unit Price Work based on the <br />number of units completed) or, in the event there is no schedule of values, as provided in the <br />General Requirements. <br />' 5.1.1. Prior to Substantial Completion, progress payments will be made in an amount <br />equal to the percentage indicated below, but, in each case, less the aggregate of <br />payments previously made and less such amounts as ENGINEER shall determine, or <br />' OWNER may withhold, in accordance with paragraph 14.02 of the General Conditions. <br />90 % of Work completed (with the balance being retainage). If Work has been <br />' 50% completed as determined by ENGINEER, and if the character and progress <br />of the Work have been satisfactory to OWNER and ENGINEER, OWNER, on <br />recommendation of ENGINEER, may determine that as long as the character and <br />' progress of the Work remain satisfactory to them, there will be no additional <br />retainage on account of Work completed, in which case the remaining progress <br />payments prior to Substantial Completion will be in an amount equal to 100% of <br />the Work completed. <br />' 90 % (with the balance being retainage) of materials and equipment not <br />incorporated in the Work (but delivered, suitably stored and accompanied by <br />' documentation satisfactory to OWNER as provided in paragraph 14.02 of the <br />General Conditions and within Section 9 -6.5 partial payments as provided in <br />FDOT Standard Specifications for Road and Bridge Construction. <br />05/08 Final Version 00500 -2 05 -4893 <br />