Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />SECTION 00900 <br /> <br />Addendum No.1 (Mav 15. 2008) <br />to <br />Contract documents <br /> <br />CITY OF SUNNY ISLES BEACH <br />City Hall Improvements <br />CUBELLlS PROJECT NO. 070662FLAR <br />CITY BID NO. 08-05-02 <br /> <br />To All Bidders: <br /> <br />Bidders for the above-referenced project shall take note of the following changes, <br />additions, deletions, clarifications, etc. to the Plans and Specifications, which in <br />accordance with the Contract Documents shall become a part of and have precedence <br />over anything shown or described otherwise. <br /> <br />IN THE CONTRACT DOCUMENTS: <br /> <br />1. In Document 00300 replace page 2 in its entirety. <br />2. Attached Pre-bid minutes to be added to contract documents. <br />3. 1 st floor ceiling of the existing Garage Building shall be cleaned, primed, and <br />painted. Only the 1st floor ceiling is to be painted, which means that all other ceilings <br />will not be painted. Please refer to the Specifications Book for painting materials and <br />execution. The work for this item is to be included in Line Item #2 of the Bid <br />Schedule. <br /> <br />4. In response to bidders RFI"S: <br /> <br />Turner Construction: <br />a) Please advise if there will be LEED requirements as specified in Spec <br />Section Division 1 and throughout the spec sections. If so, what is the <br />certification level you wish to achieve and is there available LEED <br />"checklist" for this specific project. <br />Response: The Scope of Work for this Bid does not include <br />complying with LEED-endorsed parameters. Additionally, LEED <br />certification will not be sought with this project. <br />b) Please confirm that the "Building Permit" cost will be paid directly by the <br />City of Sunny Isles Beach and should NOT be included in our base bid as <br />mentioned during the pre-bid meeting. <br />Response: Fee will be waived, but a permit will still be required to be <br />submitted by the contractor. <br />c) Please advise if the Builder's Risk or equivalent property insurance rider <br />will be provided by the Owner for its full value and will pay all deductibles <br />associated with any claims. <br />Response: No, the contractor must supply Builder's Risk for their <br />scope of work for the entire construction time. <br /> <br />Addendum No. 1 <br /> <br />00900-1 <br />