My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2008-1273
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2008
>
Reso 2008-1273
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2015 1:43:11 PM
Creation date
10/7/2008 10:35:13 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2008-1273
Date (mm/dd/yyyy)
06/19/2008
Description
Merkury Development City Hall Improv Agrmt 1st Amendment ($300,000)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />!I <br />I <br />!I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />City of Sunny Isles Beach <br />18070 Collins Avenue <br />Sunny Isles Beach, Florida 33160 <br /> <br />Mandatory Pre-Bid Conference Summary Minutes <br />Wednesday, May 7, 2008 at 11:00 a.m. <br /> <br />Bid No. 08-05-02, City Hall Improvements <br /> <br />Public Works Director/Engineer Rick Conner opened the Pre-Bid Conference and introduced <br />Architect Bruce Wasersztein of Cubellis, who presented an overall description ofthe project, noting <br />that there will be a single (prime) contractor for the City. Mr. W asersztein ' s contact information is <br />on the drawings, and you can email himatbwasersztein(iiJ.cubellis.c0111 <br /> <br />Deadline for submission of bid documents is Monday, May 19,2008 at 10:45 a.m. at which time <br />those sealed bids will publicly opened. Any additional questions are required to be in writing and <br />may be submitted up to five (5) days before the bid opening (Wednesday, May 14, 200S), which will <br />be answered and forwarded to all of today' s participants. <br /> <br />QUESTIONS AND COMMENTS FROM PROSPECTIVE BIDDERS <br /> <br />1. Can we do a walk around? <br />Yes, all the jobs are within this building. <br /> <br />2. Will there be a prime contractor here? <br />Yes, there is to be a pl"ime contractor that will handle everything. <br /> <br />3. Can we get a list of the General Contractors? <br />Yes. <br /> <br />4. On Page Al 04 of the Plans, Detail #3, there is a note that says 4-inch C.M.U. planter wall <br />4S-inches high, and in detail #7 it only talks about I-foot, 4-inches high. <br />The correct height is I-foot, 4-inches high, and an addendum will be issued for <br />. clarification on this and everything clse. <br /> <br />5. Can we get more information on the various situations where there is glass and glazing? <br />Yes. In looking at the existing building, there is a supplier for the glass and the <br />storefront, the mullions for the curtain walls, the quality of the curtain walls and all the <br />glass in this building is visually unique, and everything that is going to be done with <br />this project needs to match the quality, the look, and the style, use the same supplier for <br />the glass and all related materials. <br /> <br />Sheet AI03: There is a plan and elevation for a stainvay located in front of the <br />building which is the east elevation of the building, anti that stairway leads from the <br />street open level to the Police Depal"tment on the 2nd Floor of this building. That <br />stairway is going to be enclosed in glass, and it is going to have a card reader and panic <br /> <br />Bid 08-05-02 Pre-Bid Conference QA <br /> <br />Page 1 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.