Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />hard"ware, and will only be accessible to people who have the proper authority to enter, <br />and then as an exit, a discharge for the building. This is the largest hid of glassware in <br />this project. <br /> <br />6. On one side it says tempered glass, and on the other side it says impact glass. <br />Sheet Al03: !;i-inch tempered glass, it has to be largc and small missile impact rated, as <br />every assembly of storefront v~lJ.iety needs to have a Notice of Acceptance, and the <br />Building Code requires impact rating. The assemblies that are chosen al.c going to <br />have that NOA and they will be tcsted for impact rating, however, thc glass is tempered <br />glass. <br /> <br />Another area that has glass is in Sheet Al04, Detail #1 and #5: thc existing guragc has <br />transitions from the garage into thc main building of the officcs, there is an opening on <br />the north side of the elevators where there is rain coming in and causing problems with <br />ponding of water. We arc putting in fixed glass windows and again, they have to match <br />the existing building. <br /> <br />7. Will wind pressure be specified in Sheet Al 03? <br />We will provide you with the wind pressures. <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />The only other area related to glass is in Sheet Al 04, Dctail #2 (Floor Plan) and #6 <br />(Elevation/Section): There is an existing door leading into the entrance of the <br />Commission Chambers, but there is no antechambcr, no separation from existing <br />exterior door into the space, and so once you open that door, the noise comes inside of <br />the chambers. Inside of the existing doors, we are adding a small antechamber with <br />some interior doors, and doors in the drawings do not have any hardware, any locking <br />devices, they are only there for noise purposes. In order to create that antechamber, we <br />need to add a wall and enclosing it with another wall that has thc door, and the existing <br />scaling to the area is going to remain. There is an existing ceiling there that is 9-feet <br />high. <br /> <br />Sheet AWl: The biggest job of this project is a ncw roof structurc. Then is an <br />existing roof which is all pre-C~lst and it circlcs around the building, but it ends in a <br />particular spot just where the Post Officc is. We are extending this roof so that people <br />walking along this exterior galleria, can walk into the garage building without getting <br />wet. In onlcl. to complete that roof, we an adding a couple of columns, there is somc <br />demolition w01"k involved, it is all reinforced concrete, there is lightweight framing <br />underneath the concrcte to creatc a false ceiling, there is sprinklcr work to be done in <br />this situation. Below that new roof is where we are going to be adding that new bench <br />that we spoke about at the beginning of the meeting. <br /> <br />Sheet Al 02, Detail #8, #4, and #1: The garage building has 3 Yz noors, and the 3nl floor <br />is the connection to existing elcvators. Those existing elevator doors are open to thc <br />elcments, wc are going to be adding a new aluminum structure to give weather <br />protection to those elevator doors. Additionally, in that area there is going to he some <br />light dcmolition wo.-l( to add a new exterior door to the interior building. This huilding <br /> <br />Bid 08-05-02 Pre-Bid Conference QA <br /> <br />Page 2 of 5 <br />