My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2008-1273
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2008
>
Reso 2008-1273
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2015 1:43:11 PM
Creation date
10/7/2008 10:35:13 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2008-1273
Date (mm/dd/yyyy)
06/19/2008
Description
Merkury Development City Hall Improv Agrmt 1st Amendment ($300,000)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />'. <br /> <br />I <br /> <br />I <br />I <br /> <br />has an awkward situation where the parking level is called 3, whereas the interior of <br />the building dght above that parking area is 3A, and it is 42-inches higher than the <br />garage level, and so when YOll get into the elevator you go up Y2 a stOl"Y, the elevator just <br />creeps slowly, and then it opens and you get into the building. The users ohhe building <br />are trying to eliminate that hassle by adding a new exterior staircase that only goes 42- <br />inches high and it goes into the building through that new door, This assembly is next <br />to the existing elevator doors and everything occurs underneath that aluminum canopy <br />in the 3rd floor, There is no sprinlder work to be done there, the new door will have a <br />card reader, and it is not an exit so there is not going to be panic hardware. <br /> <br />I <br /> <br />I <br /> <br />Sheet A103, Detail #2 and #5: This is a small piece of the project that occurs <br />underneath the ] sf level of the parking garage where the Post Office, generator, <br />telephone, sttu"age, and mechanical, is located, The existing gcncrato" is accessed <br />thnHlgh a pair of steel doors that need to be raised up 8-inches. So you need to take out <br />the existing doors, make a ledge that you will find in Sheet A 701, Detail #6: This is <br />going to be a removable ledge that is screwed into the nOO1', to be used for maintenance <br />or replacement to the generator, whereas they can simply remove this smallS-inch high <br />petition and roll right in, In general operation this S-inch high ledge is going to prevent <br />flooding into the generator room. This will include some minor demolition, some <br />reusing of existing doors, and nothing much more than that. <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br /> <br />This building is three (3) years old, it is a visually attractive building, it is symbolic of <br />where the City of Sunny Isles Beach is headed, and it is a landmark building. The <br />work that needs to be done, especially with regards to the east staircase that is so <br />visible, the quality of the materials and workmanship needs to be top-notch. <br /> <br />I <br /> <br />You will need to propose how staging would be handled, or how you would move about <br />within the project. You do need to consider what gets done during the construction, it <br />is out in thc open, it needs to be protected accordingly, it can't be taken lightly, it is <br />open to all sorts of lawsuits. This building is frequented daily by a number of people, <br />many of them in advanced years, many children come to this building to thc public <br />Library, and so during construction, a lot of carc needs to be takcn with what you arc <br />doing. You need to comply with cvery code that might be applicablc, you need to take <br />extra precautions where nccessa1'Y, and the quality of the job is going to be very <br />important in order for the City to be happy with the '"csult. The City will be over this <br />project during the construction because of the impo"tance of the building. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />Once everybody gets a chancc to look at the drawings and get their questions to Mr. <br />Wasersztein at bwaserszteinwkubellis.com , he will try to have an addendum rcady by <br />next week. Public Work.'.; Dircctor/Engineer Rick Conner rciterated that everyone <br />must sign the attcndance sheet, and when we have the addendum rcady, we will include <br />a copy of thc attendance sheet, and thc information will also be on demandstar,com, as <br />well. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />8. Is there a budget set? <br />You as thc contractor havc thc ultimate say of what the budget is for a projcct like this. <br /> <br />I <br /> <br />Bid 08-05-02 Pre-l3id Conference Q^ <br /> <br />Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.