Laserfiche WebLink
<br />'. <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />This is worli. that has been anticipated for a long time, and in this City the general <br />procedure is to see what we can get, decide what we want to do, and the money is <br />available. <br /> <br />9. Any permits? <br />The Fire and DERM have already been covered, and the pr'oject already went through <br />a dry-run through the Building Department, and all comments have been taken, The <br />contractor that wins the award is going to have to go in and take out the plans, but <br />there is no additional work to be done in order to get the permit from our end. The fees <br />will be waived but you will be required to go get the permit. <br /> <br />For the specifications, the last draft covers everything that is req uired of the bidders in <br />terms of the contracto1'S, the bonds that arc necessary, what you need to comply with, <br />and strongly urge everyone to look through the book, and things such as the Building <br />Per'mit will be included in the bool\.. <br /> <br />10. Any prevailing wage rate requirements? <br />No, There is no federal or State money involved. <br /> <br />11. Has the bid date been revised? <br />No. The bid opening is Monday, May 19,2008 at 10:45 a.m. <br /> <br />12. When is the date for start of construction? <br />Begin as soon as possible. <br /> <br />13. If we have questions, what is your emai1 address? <br />If you should have any questions email them to Bruce Wascrsztein at <br />bwasersztein(@.cubellis.com Get the written questions into Mr. Wasersztein ASAP. <br /> <br />14. There is no number for the bench on page 300-2 in the blue book.? <br />We included that job within the concrete roof for the existing Post Office. The bench <br />spans between two (2) other columns of the covered canopy, and is part of that canopy <br />construction. <br /> <br />15. Information on bid bonds. <br />There arc three bonds on this project: 1) Bid Bond (5(1.1); 2) Performance Bond; and, <br />3) Payment Bond. <br /> <br />16. Will there be changes later to the bid and contract documents? <br />No, the attorneys have reviewed it and they are comfortable with it. <br /> <br />17. The numbers on the budget, do they include the bond cost? <br />No, <br /> <br />Bid 08-05-02 Pre-Bid Conference Qt\ <br /> <br />Page 4 of 5 <br />