My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2008-1273
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2008
>
Reso 2008-1273
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2015 1:43:11 PM
Creation date
10/7/2008 10:35:13 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2008-1273
Date (mm/dd/yyyy)
06/19/2008
Description
Merkury Development City Hall Improv Agrmt 1st Amendment ($300,000)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />18. Can we close off the building for construction? <br />No. If you need to block off for construction, the City can work with you to divert <br />traffic to the other side of the driveway, but the Post Office must remain open. <br /> <br />19. The purpose of this meeting is to look for a prime contractor? <br />Yes. The purpose of this meeting is to explain and to Held questions related to the <br />project, and the City wants this project built already. The City wants one contractor to <br />handle the project, they don't want to enter into numerous contracts with different <br />people, they want one person responsihle. <br /> <br />20. Is that a precast for the new eyebrow out of the roof? <br />No. That is cast in place, reinforced concrete. The drawings have all that information. <br />The bench has some precast items to it. <br /> <br />21. In the bid form, the general conditions, insurance, do we spread along the lines or do we <br />break them out? <br />By that format, you will have to spread them out. One concern is unbalanced hids, and <br />so make sure you are comfortahle on every single line item to stand on its own. <br /> <br />22. What is the criteria in selecting a bid? <br />There is specific language in the hid docs that the City will choose the best value bid, <br />and so we have to lool{ at more than just the hottom line. Bid it according to the form, <br />don't add line items or bids of your own on the form. <br /> <br />Everything that has heen included in this bid has gone back and forth with the lawyers, <br />the City, and Cuhellis, and we are not going to be changing it unless there is any reason <br />that we have overlooked. Through all our years of experience this document includes <br />all of the procedures and requirements that are asked of the contractor and of the bids, <br />we are not going to change it around to accommodate any particular request from one <br />contractor for this particular project that has ~l concern or a different preference on <br />how to prepare their own bid. We want everyone to comply with the way th~lt the hid <br />documents are asked to be laid out. We al'e !lot going to issue an addendum at this <br />point changing anything around given the fact that a lot of time and experience was <br />already put into the way the bid docs are laid out. <br /> <br />23. Is there a specific format for our bid response documents. <br />Make sure your bids arc bound on the side like we did the bid docs, don't include <br />notebooks. <br /> <br />The Pre-Bid Conference was concluded at 11:48 a.m., at which time the attendees went on a <br />tour around the building. The sign-in sheet will be scanned and loaded on Demand Star. <br /> <br />Bid OB-05-02 Pre-Bid Conference QA <br /> <br />Page 5 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.