My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2008-1325
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2008
>
Reso 2008-1325
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 3:52:39 PM
Creation date
2/23/2009 11:07:35 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2008-1325
Date (mm/dd/yyyy)
09/18/2008
Description
3rd Addendum to Agmt w/Marlin Engineering, SIBlvd/SR826 Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />o~ \U" <br /> <br />THIRD ADDENDUM TO CITY OF SUNNY ISLES BEACH <br />AND MARLIN ENGINEERING, INC. AGREEMENT <br />CONTRACT NO. C0708-093 <br /> <br />THIS THIRD ADDENDUM TO THE MARLIN ENGINEERING, INC. AGREEMENT, executed this <br />I ~ay of ~~~, 2008, is hereby attached to and is made a part of said Marlin Engineering. Inc. <br />Agreement Contract No. C0607-083 by and between the City of Sunny Isles Beach ("City") and Marlin <br />Engineering, Inc. ("Contractor") a business corporation licensed in the State of Florida, whose Federal <br />Identification # is . The City and Contractor hereby agree as follows: <br /> <br />1. ADDITIONAL SCOPE OF WORK: The City wishes to add to the original Marlin Engineering, Inc. <br />Agreement to provide post design services during the construction of the Sunny Isles Boulevard/SR 826 Project, to <br />provide consulting civil engineering services for the plans design of an existing 12" water main extension <br />relocation along Sunny Isles Boulevard from approximately Sta. 134+51 to Sta. 136+45 connecting to the newly <br />constructed water main completed by St. Tropez on the Bay Project, as more fully described in Attachment "A". <br /> <br />2. COST: The Contractor agrees to charge the City an amount not to exceed Twenty-Two Thousand Six <br />Hundred Fifty Dollars ($22,650.00) for said services. <br /> <br />3. TERM: The term of this Third Addendum shall begin upon the execution date of this Third Addendum <br />and shall end three (3) months thereof. <br /> <br />4. INCORPORATION OF PRIOR TERMS AND CONDITIONS: Except as modified herein, the terms <br />and conditions of the original Agreement with Marlin Engineering to provide post design services during <br />construction of the Sunny Isles Boulevard/SR 826 Project, as well as the First and Second Addendum, shall remain <br />in full force and effect. <br /> <br />IN WITNESS WHEREOF, the parties hereto have executed this document as of the date <br />mentioned above. <br /> <br />WITNESSES: <br /> <br />CONTRACTOR: <br />MARLIN ENGINEERIN <br /> <br /> <br /> <br />~A~< <br /> <br />Jane Hines, CMC, City Clerk <br /> <br />CITY OF SUNNY .ISLES BEACH <br /> <br />o r/lJ1~)~ <br /> <br />rman s. Edelcup, Mayor <br /> <br /> <br /> <br />Exhibit "A" <br /> <br />~. <br /> <br />C0708-093 Third Addendum Marlin Engineer <br /> <br />,.; <br />
The URL can be used to link to this page
Your browser does not support the video tag.