My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2008-1325
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2008
>
Reso 2008-1325
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 3:52:39 PM
Creation date
2/23/2009 11:07:35 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2008-1325
Date (mm/dd/yyyy)
09/18/2008
Description
3rd Addendum to Agmt w/Marlin Engineering, SIBlvd/SR826 Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />_._- <br /> <br />J..'." ..___.--,' ....~.. :-;o:r <br /> <br />,~- ..... ,~, . . ~..OS- 7._:::.-~ <br /> <br />_.._ u __.__..- <br /> <br />MARLtC,,~,_, <br />ENGiNEERiNG . '.':~ . . .I <br />-,~--- . '- , <br /> <br />June 16,2008 <br /> <br />MR. RICK CONNER, P.E. <br />City of Sunny Isles Beach <br />18070 Collins Avenue <br />Sunny Isles Beach, Florida 33160 <br /> <br />/ <br /> <br />I RE: PROPOSAL FOR PROFESSIONAL SERVICES <br />EXISTING WATER MAIN REPlACEMENT (EASTMOST SEGMENT) <br />Dear Mr. Conner: <br />I Marlin Engineering, Inc. is please to respond to your request for proposal for the <br />refeJenaKt project. <br />1. PROJECT <br /> <br />Provide Consulting Civil Engineering Services for the plans design of an existing <br />12" water main extension relocation along Sunny Isles Boulevard from <br />approximately Sta. 134 + 51 to Sta. 136+45 connecting to the newly constructed <br />water main completed by St. Tropez on the Bay Project.. <br /> <br />2. SCOPE OF WORK <br /> <br />1. Data Gathering and conferences with the City of Sunny Isles, and City of <br />North Miami Beach, as well as the regulatory agencies having jurisdiction <br />on the project, including Miami-Dade County DERM and WASD. <br />2. Obtain from others: <br />· Land Surveying necessary to determine the finish ground <br />elevations and other features (e.g. driveways, trees, electric poles <br />and lights, catch basins, etc.) along the alignment of the facilities <br />being designed in general, <br />· Subsurface Utility Engineering (SUE). <br /> <br />3. Preparing water main replacement plan and profile drawings in <br />accordance with the City of North Miami Beach construction standards <br />and specifications. <br />4. Dry-run and final plans submittal through the City of North Miami Beach, <br />Miami-Dade County DERM, and Fire Depts. and Department of Health <br />(DOH) for processing and approval. . <br /> <br />.' <br /> <br /> <br />2 '9' NW 97 Avenue Miami. Florida 33172-2313 Tel. {!I051 477-7575 Fax 13051 477-7590 <br />w_.martlnenglneerlng.com <br /> <br />L- <br /> <br />ATTACHMENT "A" <br />
The URL can be used to link to this page
Your browser does not support the video tag.