My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2008-1325
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2008
>
Reso 2008-1325
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 3:52:39 PM
Creation date
2/23/2009 11:07:35 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2008-1325
Date (mm/dd/yyyy)
09/18/2008
Description
3rd Addendum to Agmt w/Marlin Engineering, SIBlvd/SR826 Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. Page 2 June 27. 2008 <br /> <br />5. Preparing pertinent pennit application fonns and the required technical <br />support information for approvals before the City of North Miami Beach <br />Engineering Department, Miami-Dade County DERM. and DOH. <br />6. Preparing an Engineer's Estimate of probable Cost. <br />7. All permit and application fees and expenses required by reviewing <br />agencies will be paid directly by City of Sunny Isles-Beach. <br />8. MEI will provide Twenty (20) sets of plans for dry-run and final process. <br />9. MEI will provide the following services during the Construction Phase of <br /> <br />~epro~ / <br />. Pre-construction Conference. <br />· Shop drawings and technical submittal review. Requests for <br />information (RFI) and plan clarification, as well as technical <br />interpretations of the construction plans when requested by Client. <br />· Three (3) Site Visits during the construction of the project. <br /> <br />3. COMPENSATION FOR PROFESSIONAL SERVICES <br /> <br />For the services performed under paragraph 2 Scope of Work, the Client will pay <br />the Engineer the lump sum fee of Twenty Two Thousand Six Hundred and Fifty <br />dollars ($22,650), as described below and payable monthly in proportion to the <br />services performed. <br /> <br />Surveying as needed <br />Design and Construction Documents <br />Plans Processing Approvals <br /> <br />$ 1,150.00 <br />$ 20,500.00 <br />$ 1,000.00 <br />$ 22,650.00 <br /> <br />TOTAL FEE <br />4. NOT INCLUDED <br /> <br />A- Bid Phase Services <br /> <br />· Document Review and meetings or discussions with the parties involved <br />in this process. <br /> <br />Should the Client wish us to provide and/or negotiate with third parties, any of the <br />aforementioned services or any other additional work not included in this proposal <br />under the Scope of Work, MEI will provide it on a Time Charge plus Expenses <br />, basis, computed as the sum of the following: <br /> <br />· Salary Costs times a multiplier of 3.00. <br /> <br />· Non-8atary expenses times a multiplier of 1.05 <br /> <br />S\B <br />
The URL can be used to link to this page
Your browser does not support the video tag.