My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2008-1356
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2008
>
Reso 2008-1356
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 3:52:39 PM
Creation date
11/18/2009 2:26:35 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2008-1356
Date (mm/dd/yyyy)
12/18/2008
Description
Agmt w/Allbrite Electric Srv, Purchase/Install Frequency Modulator for Govt Ctr
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Service and Installation <br /> <br />A. Installation <br />Installation of the ElectroFlow™ system is simple, quick and will be carried out by Allbrite <br />Electric Service Inc., and will be inspected and tested, and in perfect working order when <br />we leave your jobsite! Allbrite will also perform Infrared thermal imaging, and an <br />ultrasonic test on the switchgear the unit is connected to for added security and peace of <br />mind! <br />B. Fail Safe <br />The ElectroFlow™ system is guaranteed. Should the system fail for some extraneous <br />reason, it will isolate itself from the installation and not cause an interruption to the main <br />electrica I system. <br /> <br />C. Warranty <br />Should any ElectroFlow™ component(s) fail within the first year of operation, Allbrite will <br />replace the failed component(s), at no cost to the client. <br /> <br />Order and Delivery <br /> <br />A. Order <br />Upon acceptance by the client, we require 50% of the total system cost with the order and <br />the remaining 50% will be due upon receipt of the system by the client and not to exceed <br />30 days from such date. If the client fails to pay the remaining 50% system cost within the <br />30 day period, as the late charge, additional 2% of the total project cost will be applied to <br />the remaining balance. <br /> <br />B. Delivery <br />Delivery schedule of ElectroFlow™ equipped with standard features will be from 4 to 8 <br />weeks from the acceptance of the order, in writing, by Allbrite and after the receipt of the <br />50% system payment. For delivery schedule of ElectroFlow™ equipped with optional <br />feature(s), contact your Allbrite sales professional. <br /> <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.