Laserfiche WebLink
<br />Existing Resultants <br /> <br />Existing Resultants # FS080408.A690x1 <br /> <br />1#. Average electric hours of operation per week (hrs): <br />Average electric hours of operation is calculated based on average <br />facility's load factor for past 12 months. <br /> <br />2#. Percent in Operation at the time of Measurement(%): <br />Percent in operation is calculated based on facility's load factor/load <br />profile. <br /> <br />3#. Load Factor(%): <br />Load Factor, at the time of measurement. <br /> <br />4#. Voltage Drop(V): <br />Existing Voltage drop based on transformer secondary voltage. <br /> <br />5#. Transformer Full Load Current(A): <br />Transformer maximum continuous load-current capability. <br /> <br />6#. Transformer Loading, at the time of Measurement(%): <br />Percent transformer loading based on average load, at the time of <br />measurement. <br /> <br />7#. Transformer Loading, highest in 12 Months(%): <br />Percent transformer loading based on highest average stable <br />operating load. <br /> <br />8#. Apparent Power(KVA): <br />Apparent Power based on average operating load, at the time of <br />measurement. <br /> <br />9#. Real Power(KW): <br />Real Power based on average operating load, at the time of <br />measurement. <br /> <br />10#. Reactive Power(KVAR): <br />Reactive Power based on average operating load, at the time of <br />measurement. <br /> <br />11#. PFCC Reactive Power(KVAR): <br />Corrective Reactive Power, at the time of measurement. <br /> <br />12#. Power Factor(%): <br />Average Power Factor, at the time of measurement. <br /> <br /># These values are based on measurements taken and data received, at the time of the electrical survey! <br /> <br />20 <br /> <br />100 <br /> <br />91.9 <br /> <br />93 <br /> <br />5 <br /> <br />1806 <br /> <br />27 <br /> <br />36 <br /> <br />411 <br /> <br />371 <br /> <br />177 <br /> <br />75 <br /> <br />0.9 <br />