Laserfiche WebLink
<br />Projected Resultants <br /> <br />Projected Resultants # FS080408.A690x1 <br /> <br />12*. Improved Substation Capacity(KVA): <br />EF will reduce Reactive/Apparent Power and the losses in the system, <br />while improving voltage and balancing the phases, thus allowing <br />more capacity for additional load. <br /> <br />13*. Improved Generating Capacity(KVA): <br />EF will reduce Reactive/nonproductive Power, benefiting the Utility <br />Company, thus allowing additional customers to be served with <br />increased system efficiency. <br />14*. Power Factor(%): <br />EF will improve power factor, without any destructive or adverse <br />effects of standard capacitors. <br /> <br />15*. Transformer Short Circuit Current(A): <br />Transformer secondry short cicuit current availability, as protection <br />measure in case of short circuit or fault condition. <br /> <br />* These values are based on measurements taken and data received, at the time of the electrical survey! <br /> <br />22 <br /> <br />32 <br /> <br />29 <br /> <br />0.97 <br /> <br />31411 <br />