My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-10-02) Central Island Drainage
>
Bid Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:47 PM
Creation date
8/14/2008 11:37:27 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Central Island Drainage and Street Improvements
Bid No. (xx-xx-xx)
07-10-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />In the sixth line of Paragraph 6.20.A.. change the parenthetical insert to read as follmvs: <br /> <br />"...(including but not limited to fees and charges of ENGINEER, other engineers. architects, <br />attorneys and other professionals, particularly including, but not limited to reasonable <br />ENGINEER's attorney's fees, and court costs)...". <br /> <br />ARTICLE 9 - ENGINEER'S STATUS DURING CONSTRllCTION <br /> <br />Change the first sentence of Paragraph 9.0 1. A. to read as follows: <br /> <br />"If OVVNER and ENGINEER agree, ENGINEER will be OVVNER's representative during the <br />construction period." <br /> <br />ARTICLE 10 - CHANGES IN THE WORK: CLAIMS <br /> <br />Add the following: <br /> <br />"10.06. -Without invalidating the agreement, Owner may, at any time execute appropriate <br />Change Orders for additions and/or deletions in the work of up to 25% of the total contract <br />amount, without a change in the contract unit prices bid." <br /> <br />ARTICLE 13 - TESTS AND INSPECTIONS; CORRECTION, <br />REMOV AL OR ACCEPTANCE OF DEFECTIVE WORK <br /> <br />Replace 13.03.B. with: <br /> <br />"All testing shall be paid for by the Contractor." <br /> <br />Add the following sentence to Paragraph 13.07.A.: <br /> <br />"Specific and special warranties specified in the Contract Documents are in addition to, and not <br />in lieu of, the contractors general warranty. CONTRACTOR shall not be relieved of general <br />warranty obligations by the specification of specific products or procedures." <br /> <br />13.09. In the first sentence of the paragraph OWNER, change the first line from "If Contractor fails <br />within a reasonable time after written notice of Engineer..." to read: <br /> <br />"If Contractor fails within ten (10) calendar days after written notice of Engineer..." <br /> <br />ARTICLE 14 - PAYMENTS TO CONTRACTOR AND COMPLETION <br /> <br />In the first sentence of Paragraph 14.02.A.1., change the phrase "At least twenty days before each <br />progress payment is scheduled (but not more often than once a month), ..." to read: <br /> <br />"By no later than the first day of the month, ...". <br /> <br />Following Paragraph 14.02.A.3 add: <br /> <br />4. An original Partial Release of Lien is required from the General Contractor along with <br />the application for Payment No. 1 and for each subsequent application thereafter. For <br /> <br />I Oct. 2007 SUPPLEMENTARY CONDITIONS <br /> <br />00800-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.