My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-10-02) Central Island Drainage
>
Bid Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:47 PM
Creation date
8/14/2008 11:37:27 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Central Island Drainage and Street Improvements
Bid No. (xx-xx-xx)
07-10-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />each application for payment (excluding Application No.1) the Contractor shaJJ submit <br />with the application Partial Releases of Liens for all Notice to Owners that have been <br />received for the project by the Owner and Engineer". <br />5. With each Application for Payment, the Contractor shaJJ submit supporting records and <br />other evidence, in a form and amount acceptable to the City and the Engineer, to <br />demonstrate the expenses incurred and the Work performed. This shaJJ include, but not <br />be limited to documentation related to the purchase of Owner-Provided Material and the <br />reduction in the Contract Sum as a result of such expenditures. <br />6. Each application for Payment shall be based on the most recent schedule of values <br />submitted by Contractor in accordance with the Contract Documents. The schedule of <br />values shall aJJocate the entire guaranteed maximum Contract Price among the various <br />portions of the Work, except that the Contractor's Fee shaJJ be shown as a separate item. <br />The schedule of values shaJJ be prepared in such form and supported by such data to <br />substantiate its accuracy as the Engineer may require. This schedule, unless objected to <br />by the Engineer, shaJJ be used as a basis for reviewing the Contractor's Applications for <br />Payment. <br />7. Applications for payment shall show the percentage of completion of each portion of the <br />Work as of the end of the period covered by the Application for Payment. The <br />percentage of completion shall be the lesser of: (l) the percentage of that portion of the <br />Work which has actuaJJy been completed; or (2) the percentage obtained by dividing (a) <br />the expense that has actuaJJy been incurred by the Contractor on account of that portion <br />of the Work for which the Contractor has made or intends to make actual payment prior <br />to the next Application for Payment by (b) the share of the Contract Price allocated to <br />that portion of the Work in the schedule of values. <br />8. Subject to the provisions of the Contract Documents, the amount of progress payments <br />shaJJ be computed as foJJows: <br />a) take that portion of the Contract Price properly allocable to the computed Work <br />as determined by multiplying the percentage of completion of each portion of <br />the \^/ ark in the schedule of values. Pending final determination of the costs to <br />the Owner of changes in the Work, amounts not in dispute shaJJ be included in <br />the Application for Payment along with Change Order, Work Change Directive <br />or Written Amendment indicating the parties' agreement with all or part of such <br />costs for additional Work. <br />b) add the portion of the Contract Price properly allocable to materials and <br />equipment delivered and suitably stored at the site for subsequent incorporation <br />in the Work, or, if approved in advance by Owner, suitably stored off-site at a <br />location agreed upon in writing. <br />c) add the Contractor's Fee, less the ten percent (10%) Retainage. The Contractor's <br />Fee shaJJ be computed upon the Cost of the Work described in the preceding <br />clauses at the rate in accordance with Paragraph 11.0 1.C or, if the Contractor's <br />Fee is stated as a fixed sum, then it shall be an amount that bears the same ratio <br />to that fixed-sum fee as the Cost of the Work in the two preceding clauses bears <br />to a reasonable estimate of the probable Cost of Work upon completion. <br />d) subtract the aggregate of the previous payments made by the Owner; <br />e) subtract the shortfall, if any, indicated by the Contractor in the supporting <br />records and other evidence as mutually agreed between the Owner or Engineer <br />and Contractor to demonstrate expenditures incurred to substantiate prior <br />Applications for Payment, or resulting from errors subsequently discovered by <br />Owner, or designee; <br /> <br />I Oct. 2007 SUPPLEMENTARY CONDITIONS <br /> <br />00800- 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.