My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-10-02) Central Island Drainage
>
Bid Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:47 PM
Creation date
8/14/2008 11:37:27 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Central Island Drainage and Street Improvements
Bid No. (xx-xx-xx)
07-10-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />damages arising from non-completion of work within the time limit, but all such liabilities shall <br />be subject to continuation in full force against the Contractor. <br /> <br />24. Materials and Supplies: <br /> <br />It is understood and agreed by and between the parties hereto that the materials to be used in any <br />work performed under this Contract and specifications, with the exception of structural metal <br />work, machinery and treated lumber, shall be purchased to the extent possible from or through <br />merchants located within the City of Sunny Isles Beach, Florida. <br /> <br />25. "Or EQual" Clause: <br /> <br />Whenever a material, article or piece of equipment is identified on the Plans or in the <br />Specifications by reference to manufacturers or vendors names, trade names, catalog numbers, or <br />otherwise, it is intended merely to establish a standard; and, any material, article, or equipment of <br />other manufacturers and vendors which will perform or serve the requirements of the general <br />design will be considered equally acceptable provided the material, article, or equipment so <br />proposed, is, in the opinion of the Engineer, equal in substance, quality and function. It shall not <br />be purchased or installed by the Contractor without the Engineer's prior written approval. <br /> <br />26. Plans and Workin2. Drawin2.s: <br /> <br />Certain plans supplied by the City accompany and supplement these Contract Documents. The <br />City through its Engineer shall have the right to modify the details of these plans, to supplement <br />these plans with additional plans or with additional information as the work proceeds, all of <br />which shall be considered as plans accompanying these Specifications herein generally referred to <br />as the "Plans". In case of disagreement between the Plans and Specifications, the Specifications <br />shall govern. <br /> <br />The Contractor shall prepare whatever detailed working drawings are necessary to enable him to <br />fabricate, erect and construct all parts of the work in conformity with the Plans and Specifications. <br />Working drawings shall include shop drawings and erection diagrams for structural steel. <br />Working drawings shall be submitted to the Engineer in quintuplicate; two sets will be returned to <br />the Contractor approved or showing the changes or corrections required; if changes or corrections <br />are required, five copies shall be resubmitted until they are approved. <br /> <br />The Contractor shall report any errors or discrepancies found in the drawings to the Engineer, <br />who will make or approve necessary corrections. The City shall not be responsible for errors or <br />minor discrepancies of the Contractor's drawings, even though approved, or for minor errors or <br />minor discrepancies of the Engineer's drawings. <br /> <br />Payment for working drawings, revisions thereof, and for copies furnished, shall be included in <br />the amounts bid for materials or Work. The Contractor shall furnish as many sets of paper <br />blueprint copies for working drawings as the City and the Engineer may need for the Work. The <br />Contractor should allow a minimum of fourteen (14) calendar days for the City's approval of shop <br />drawings. <br /> <br />27. Explosives: <br /> <br />No explosives or blasting shall be used or done in the project. <br /> <br />General Specifications Oct. 2007 <br /> <br />Page l3 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.