Laserfiche WebLink
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />29. <br /> <br />Inlets. Manholes and Junction Boxes (Section 425) <br /> <br />The applicable portions of the Metropolitan Miami-Dade County Public Works Manual (latest <br />edition), Part 1, Standard Details, as pertain to the design and construction of drainage wells and <br />structures, are part of these Contract Documents. <br /> <br />Section 425-6.7 - BACKFILLING: Add the fo]]owing to this sub-article: <br /> <br />Select material sha]] be used for backfill adjacent to riser inlets, manholes and drainage we]] <br />structures as detailed in the Plans. It sha]] consist of well-graded limerock or limerock and sand fill. <br />Sand or fi]] having a high proportion of sand wi]] not be accepted as select fill. All selected fill sha]] <br />be approved by the Engineer prior to placing. No separate payment wi]] be made for select fill, but <br />sha]] be included in the Unit Price Bid for each particular item as indicated in the Bid Form of the <br />Proposal. <br /> <br />Section 425-8.2 - Adjusting Structures: This sub-article is expanded to include: <br /> <br />Upon completion of the Work and prior to acceptance and final payment a]] such structures will be <br />inspected by the Engineer to ensure that they are free of a]] debris and thoroughly cleaned. <br /> <br />30. <br /> <br />Adiustment or Relocation of Valve. Meter, Mail Boxes and Pull Boxes (Section 425-8.2) <br /> <br />The Work under these pay items includes any adjustments, relocation (raising, or lowering) of <br />existing valve, meter, mail boxes and pu]] boxes. <br /> <br />When relocation ofthe box is required, the Contractor sha]] make all necessary arrangements with the <br />utility companies, as the utility companies are responsible to relocate the valves and meters and valve <br />and meter boxes. Relocation of mail boxes are the Contractor's responsibility <br /> <br />31. <br /> <br />Concrete Pipe (Section 449) <br /> <br />449-4.1 Special Requirements: <br /> <br />Concrete Pipe sha]] meet the design requirements of the class of pipe ca]]ed for on the Bid Form of <br />the Proposal, Pipe design shall be based upon requirements set forth in ASTM C 76 or Special <br />Design which meet the requirements of ASTM C 655. For pipe designated as Class S, the pipe design <br />will meet the requirements for ASTM C 655 and the 0.01" crack and ultimate D-Ioads given on the <br />Roadway and Traffic Design Standards, Index Number 205. <br /> <br />The Process of manufacture and the details of the pipe design, including strength of the concrete, wiU <br />comply with the Standard Operating Procedure for the Inspection of Precast Drainage Products. <br /> <br />At the Contractor's option non-reinforced pipe up to and including 36" diameter, may be used in <br />place of reinforced concrete pipe designated Class S, Class I, II, III, and IV. Non-reinforced pipe <br />sha]] meet the requirements of ASTM C 985 and the ultimate D-loads given on the Roadway and <br />Traffic Design Standards, Index Number 205. such pipe sha]] be properly marked. <br /> <br />Plugging of existing pipes to be abandoned in place sha]] comply with section 430 4.5 <br /> <br />Rubber gaskets for concrete pipe joints sha]] comply with section 420. <br /> <br />Oct. 2007, Special Provisions <br /> <br />Page 13 of 15 <br />