My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-10-02) Central Island Drainage
>
Bid Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:47 PM
Creation date
8/14/2008 11:37:27 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Central Island Drainage and Street Improvements
Bid No. (xx-xx-xx)
07-10-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />32. <br /> <br />Sodding (Section 575) <br /> <br />The specifications for sodding shall conform to the applicable portions of Section 575 with the <br />fol1owing exception: <br /> <br />Incorporate the fol1owing to the applicable section, deleting al1 references that are contrary: The <br />Contractor is required to mow all sodded areas immediately prior to final acceptance of the Work by <br />the City. <br /> <br />The payment for mowing, maintaining the sod in a moist condition for a period of at least two weeks. <br />as wel1 as payment for the water and fertilizer shal1 be included in the Contract Unit Price Bid for <br />Sodding, as indicated in the Bid Form of the Proposal. <br /> <br />33. <br /> <br />Tree relocation <br /> <br />A. General <br /> <br />1. Scope: <br />Provide all labor, materials, equipment, transportation, watering supervision and all related work for <br />root pruning, trimming of limbs, loading and unloading, hauling and planting trees or palms in <br />locations indicated on the drawings or as directed by the Engineer included herewith. <br /> <br />2. Maintenance: <br />The contractor shal1 be responsible for the maintenance after the relocation of the trees or palms. <br /> <br />B. Materials: <br /> <br />1. Backfill Material: <br />The existing material excavated from the planting pit is to be used as backfill. <br /> <br />2. Water: <br />The Contractor shal1 provide potable water by an approved method by the Engineer <br /> <br />3. Pruning Paint: <br />Pruning Paint shall be asphalt base and contain ingredients that are antiseptic and aid healing of the <br />wound. There shall not be any growth inhibitors in the pruning paint. <br /> <br />C. Execution: (Preparation of Plant Material to be relocated) <br /> <br />1. Pruning: <br />Trees shal1 be root pruned six (6) weeks prior to relocation. No backhoes or trenchers shall be used in <br />the process. <br /> <br />Pruning of the canopy shal1 be executed just prior to root pruning. The extend of pruning shall be the <br />minimum needed to reduce shock resulting from severing of roots, however, no branches larger that <br />one (l ") inch diameter shall be trimmed other than at the branch col1ar. <br /> <br />Oct. 2007, Special Provisions <br /> <br />Page 14 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.