My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Misc./Addenda
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-10-02) Central Island Drainage
>
Misc./Addenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2011 10:06:06 AM
Creation date
8/14/2008 12:05:26 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Central Island Drainage and Street Improvements
Bid No. (xx-xx-xx)
07-10-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />pipe on muck? Is there going to be a requirement to over excavate and provide for a <br />foundation? <br />Do not build on muck. Cost of trench excavation, disposal of excess of material <br />removal, backfill with suitable selected material, reposition of pavement, landscaped <br />areas, "SHALL BE INCLUDED IN THE UNIT PRICE FOR SEWER <br />CONSTRUCTION", and comply with FDOT governing standards and specifications as <br />stated. <br /> <br />27. Where is the draincrete called out to under drain details to be used, and what are the limits <br />and dimensions for the draincrete? A draincrete is porous concrete that allows water to go <br />through as we saw in the plans - it wasn't in the list of items - they found it somewhere else. <br />Draincrete requit'ements were removed from Swale Trench Detail (Underdrain) on <br />Sheet # 37. "DO NOT USE DRAINCRETE". <br /> <br />28. Is the City using FDOT or County specifications? It makes a difference in price. <br />Use Miami-Dade County specifications standards. Price adjustments for asphalt will <br />be as indicated in DIVISION II, Special Provisions, Section 27, Bituminous Material- <br />Payment Adjustment. <br /> <br />29. Milling for depth or for crossroad correction? <br />Milling for depth. <br /> <br />30. Widening and type crossings are shown but there are no mentions of asphalt work. What is <br />the City's intent in those areas? There are a couple of milling and resurfacing areas. Are you <br />going to leave it? <br />Whatever we are resurfacing - there has to be milling. We have two cases: milling and <br />resurfacing; and milling and overbuild <br /> <br />31. There are very specific FDOT requirements QC at the plant and at the roadway for asphalt. <br />Is it going to be Miami-Dade County spec or FDOT spec because there is a significant <br />difference? <br />Quality control for asphalt will be as per Miami-Dade County standards. <br /> <br />32. Regarding sod, is there a restriction as far as limits to which the City is facing? For instance, <br />on North Bay Road we have to go between trees, how wide of an area, what are your limits <br />for restoration of the sod, by the park especially? <br />For landscape restoration after trench excavation, please refcr to Shcet # 5, note # 17, <br />and Pavement Pestoration and Pipe Trench Detail on sheet # 37 <br /> <br />33. The equipment outside of that trench in the tracks will be the contractor's responsibility? <br />Yes. <br /> <br />34. What does the City consider the difference between a small tree and large tree? There seems <br />to be a lot of large trees that need to be removed. <br />Large trees are considered those which caliper is 18" or larger measured 48" from the <br />ground. Small trees under 18". <br /> <br />Bid 07-10-02 Prc-Bid Confercncc Ql\ (2) <br /> <br />Pagc 4 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.