My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-10-04) Landscaping Maintenance Services
>
Bid Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:50 PM
Creation date
8/13/2008 3:01:18 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Landscape Maintenance Services
Bid No. (xx-xx-xx)
07-10-04
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Field Order: A written order issued by the City which clarifies or interprets the Contract <br />Documents or orders minor changes in the Work. <br /> <br />Modification: Modification means anyone of the following: (a) a written amendment of the <br />Contract Documents signed by both parties, (b) a Change Order, (c) a written clarification or <br />interpretation if issued by the City, or (d) a written order for minor change or alteration in the <br />Work issued by the City. A modification may only be issued after execution of the Agreement. <br /> <br />Notice of Award: The written notice by City to the apparent successful Bidder stating that upon <br />compliance with the condition s precedent to be fulfilled by him within the time specified, City will <br />execute and deliver the Agreement to him. <br /> <br />Notice to Proceed: A written notice given by City to Contractor fixing the date on which the <br />Contract Time will commence to run and on which Contractor shall start to perform their <br />obligations under the Contract Documents. <br /> <br />Project: The entire landscape maintenance services to be performed as proVided in the <br />Contract Documents. <br /> <br />Samples: Physical examples which illustrate materials, equipment or workmanship and <br />establish standards by which the Work will be judged. <br /> <br />Shop Drawings: All drawings, diagrams, illustrations, brochures, schedules and other data <br />which are prepared by the Contractor, a Sub-Contractor, manufacturer, supplier, or distributor, <br />and which illustrate the equipment, material or some portion of the work and as required by the <br />Contract Documents. <br /> <br />Specifications: Those portions of the Contract Documents consisting of written technical <br />descriptions of materials, equipment, construction systems, standards and workmanship as <br />applied to the Work. <br /> <br />Statement of Services: The form furnished by the City which is to be used by the Contractor in <br />requesting progress payments. <br /> <br />Sub-Contractor: An individual, firm or corporation having a direct contract with Contractor or <br />with any other Sub-Contractor for the performance of a part of the Work at the site. <br /> <br />Substantial Completion: The date as certified by the City when the construction of the <br />Project or a certified part thereof is sufficiently completed, in accordance with the Contract <br />Documents, so that the Project or specified part can be utilized for the purposes for which it was <br />intended; or if there be no such certification, the date when final payment is due. <br /> <br />Supplier: Any person or organization who supplies materials or equipment for the Work, <br />including that fabricated to a special design, but who does not perform labor at the site. <br /> <br />Surety: The corporate body which is bound with the Contractor and which engages to be <br />responsible for the Contractor and their acceptable performance of the Work. <br /> <br />Work: Any and all obligations, duties and responsibilities necessary to the successful <br />completion of the Project assigned to or undertaken by Contractor under the Contract <br />Documents, including all labor, materials, equipment and other incidentals, and the furnishing <br />thereof. <br /> <br />PAGE 11 OF 92 <br />BID No. 07-10-04 <br />
The URL can be used to link to this page
Your browser does not support the video tag.