My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-01) Town Center Park Lighting Improvements
>
Bid Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:52 PM
Creation date
8/15/2008 3:50:53 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Town Center Park Lighting Improvements
Bid No. (xx-xx-xx)
08-05-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />n <br />B <br />g <br />I <br />m <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1. Make no changes or relocations without prior written notice to the <br />Engineer. <br />2. Report to the Engineer when any reference point is lost or <br />destroyed, or requires relocation because of necessary changes in <br />grades or locations. <br />3. Require surveyor to replace project control points which may be <br />lost or destroyed. <br />a. Establish replacements based on original survey control. <br /> <br />1.05 PROJECT SURVEY REQUIREMENTS <br /> <br />A. Establish a minimum of two temporary bench marks on site, referenced to <br />data by survey control points. <br />1. Record locations, with horizontal and vertical data, on Project <br />Record Documents. <br /> <br />B. Establish lines and levels, locate and layout, by instrumentation and <br />similar appropriate means: <br />1. Site Improvements <br />a. Stakes for grading, fill and topsoil placement. <br />b. Utility slopes and invert elevations. <br />2. Batter boards for structures <br />3. Building foundation, column locations and floor levels. <br />4. Controlling lines and levels required for mechanical and electrical <br />trades. <br /> <br />C. From time to time, verify layouts by same methods. <br /> <br />1.06 RECORDS <br /> <br />A. Maintain a complete, accurate log of all control and survey work as it <br />progresses. <br /> <br />B. At the end of each pay period and at the end of the job, submit certified <br />as-built information on mylars of Engineer's line drawings indicating <br />building and tank locations, elevations and stations of all underground <br />piping at 50 foot increments, at rapid changes in grade and at all fittings, <br />valves, conflicts, or any distinctive feature locations. <br /> <br />C. At the end of the project, submit a certified site survey at 1 "=50' scale on a <br />reproducible tracing sheet 24" x 36", indicating the building corners and <br />location of all structures. <br /> <br />1.07 SUBMITTALS <br /> <br />A. Submit name and address of registered land surveyor to the Engineer. <br /> <br />04/08 <br /> <br />01050-2 <br /> <br />06-5723 <br />
The URL can be used to link to this page
Your browser does not support the video tag.