Laserfiche WebLink
<br />D <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />B. On request of the Engineer, submit documentation to verify accuracy of <br />field engineering work. <br /> <br />C. Submit certificate signed by registered surveyor certifying that elevations <br />and locations of improvements are in conformance or non-conformance, <br />with Contract Documents. <br /> <br />D. Submit drawings showing locations of all structures constructed. This <br />drawing shall be included with the project record documents <br /> <br />PART 2 - PRODUCTS (Not Used) <br />PART 3 - EXECUTION (Not Used) <br /> <br />END OF SECTION <br /> <br />04/08 <br /> <br />01050-3 <br /> <br />06-5723 <br />