Laserfiche WebLink
<br />D <br />I <br />D <br />I <br />I <br />D <br />I <br />I <br />I <br />I <br />I <br />m <br />I <br />I <br />m <br />I <br />I <br />I <br />I <br /> <br />DOCUMENT 01370 <br /> <br />SCHEDULE OF VALUES <br /> <br />PART 1 - GENERAL <br /> <br />1.01 REQUIREMENTS INCLUDED <br /> <br />A. Submit to the Engineer a Schedule of Values allocated to the various <br />portions of the Work, within 21 days after the effective date of the <br />Agreement. <br /> <br />B. Upon request of the Engineer, support the values with data which will <br />substantiate their correctness. <br /> <br />C. The Schedule of Values shall be used as the basis for the Contractor's <br />Applications for Payment. <br /> <br />1.02 RELATED REQUIREMENTS <br /> <br />A. Document 00700: Conditions of the Contract <br /> <br />B. Section 01152: Application for Payment <br /> <br />1.03 FORM AND CONTENT OF SCHEDULE OF VALUES <br /> <br />A. Type schedule on an 8-1/2 inch x 11 inch or 8-1/2 inch x 14 inch white <br />paper; Contractor's standard forms and automated printout will be <br />considered for approval by the Engineer upon Contractor's request. Identify <br />schedule with: <br />1. Title of Project and location <br />2. Engineer and Project number <br />3. Name and Address of Contractor <br />4. Contract designation <br />5. Date of submission <br /> <br />B. Schedule shall list the installed value of the component parts to include <br />earthwork/foundation, reinforced concrete, masonry, hollow core roof, <br />roofing material, painting/coatings, individual equipment, piping, electrical, <br />paving, of the Work (as required) in sufficient detail to serve as a basis for <br />computing values for progress payments during construction. <br /> <br />C. For the various portions of the Work: <br />1. Each item shall include a directly proportional amount of the <br />Contractor's overhead and profit. <br /> <br />04/08 <br /> <br />01370-1 <br /> <br />06-5723 <br />