My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-01) Town Center Park Lighting Improvements
>
Bid Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:52 PM
Creation date
8/15/2008 3:50:53 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Town Center Park Lighting Improvements
Bid No. (xx-xx-xx)
08-05-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />SECTION 01505 <br /> <br />CONTROL OF WORK <br /> <br />PART 1 - GENERAL <br /> <br />1.01 QUALITY OF WORK <br /> <br />A. The Contractor shall furnish personnel and equipment which will be <br />efficient, appropriate and a quantity large enough to secure a satisfactory <br />quality of work and a rate of progress which will insure the completion of <br />the work within the time stipulated in the Proposal. If at any time such <br />personnel appear to the Engineer to be inefficient, inappropriate or <br />insufficient for securing the quality of work required or for producing the <br />rate of progress aforesaid, he may order the Contractor to increase the <br />efficiency, change the character or increase the personnel and equipment, <br />and the Contractor shall conform to such order. Failure of the Engineer to <br />give such order shall in no way relieve the Contractor of his obligations to <br />secure the quality of the work and rate of progress required. <br /> <br />1.02 PRIVATE LAND <br /> <br />A. The Contractor shall not enter or occupy private land outside of <br />easements, except by written permission of the Owner. <br /> <br />1.03 PIPE LOCATIONS <br /> <br />A. Pipeline shall be located substantially as indicated on the Drawings, but <br />the Engineer reserves the right to make such modifications in locations as <br />may be found desirable to avoid interference with existing structures or for <br />other reasons. <br /> <br />1.04 OPEN EXCAVATIONS <br /> <br />A. All open excavations shall be adequately safeguarded by providing <br />temporary barricades, caution signs, lights and other means to prevent <br />accidents to persons, and damage to property. The Contractor shall, at <br />his own expense, provide suitable and save bridges and other crossings <br />for accommodating travel by pedestrians and workmen. Bridges provided <br />for access to private property during construction shall be removed when <br />no longer required. The length of open trench will be controlled by the <br />particular surrounding conditions, but shall always be confined to the limits <br />prescribed by the Engineer. If the excavation becomes a hazard, or if it <br />excessively restricts traffic at any point, the Engineer may require special <br />construction procedures such a limiting the length of open trench, <br /> <br />04/08 <br /> <br />01505-1 <br /> <br />06-5723 <br />
The URL can be used to link to this page
Your browser does not support the video tag.