Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />04/08 <br /> <br />found, the Contractor shall cause the same to be repaired or removed and <br />replaced by proper materials and workmanship without extra <br />compensation for the materials and labor required. Further, the <br />Contractor shall be fully responsible for the satisfactory maintenance and <br />repair of the construction and other '.^fork undertaken herein, for at least <br />the guarantee period described in the contract. <br /> <br />c. <br /> <br />Further, the Contractor shall take all necessary precaution to prevent <br />damage to any structure due to water pressure during and after <br />construction and until such structure is accepted and taken over by the <br />Owner. <br /> <br />END OF SECTION <br /> <br />01505-3 <br /> <br />06-5723 <br />