My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Development and Communication Group of Florida, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-06-01) Atlantic Isle Roadway and Utility Improvements
>
Responses
>
Development and Communication Group of Florida, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:53 PM
Creation date
8/20/2008 4:56:20 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
werwer
Bid No. (xx-xx-xx)
07-05-08
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~ <br /> <br />SECTION 00900 <br /> <br />Addendum NO.5 <br />to <br />Contract documents <br /> <br />CITY OF SUNNY ISLES BEACH <br />Atlantic Isles Roadway and Utility Improvements <br />CGA PROJECT NO. 05-4893 <br />CITY BID NO. 08-06-01 <br /> <br />To All Bidders: <br /> <br />Bidders for the above-referenced project shall take note of the following changes, <br />additions, deletions, clarifications, etc. to the Plans and Specifications, which in <br />accordance with the Contract Documents shall become a part of and have precedence <br />over anything shown or described otherwise. <br /> <br />IN THE CONTRACT DOCUMENTS: <br /> <br />1. In Document 00300, replace in its entirety. <br />2. Clarification to Southeastern Engineering's question p in Addendum No. 3 (In <br />case RTU antenna will be part of contract, who provides the program and set up <br />communication. Response: Response: This is the responsibility of Miami- <br />Dade Water and Sewer Department. <br />3. In response to bidders RFI'S: <br />Conquest Enqineering: <br />a) In the electrical section in Addendum No. 3 breakdown an item has been <br />added (Fall 25kva transformer). It is the 70th item on the breakdown; it is <br />in the lift station subdivision. The Fall 25kva does not appear on the plans <br />I have in my possession. It's necessary that I receive more information on <br />that item to inform my supplier. <br />Response: This will be FPL supplied. <br />b) Item #70 what kind of transformer are you inquiring about and is it the <br />normal utility supplied transformer or a different one? (He needs phasing, <br />primary and secondary voltages, and transformer impedance). <br />Response: This will be FPL supplied. <br />c) Item #72 disconnect switch? Is this the one supplied for the station, <br />single-phase stainless steel fusible? <br />Response: There are two (2) disconnects one for the lift station the <br />other for the street light service, both will be stainless steel nema 4x. <br />d) Item #73 you are inquiring about %" RGS this is a Metro Dade Station that <br />requires 2" conduit to the wet well via a motor junction box. <br />Response: All work must be in accordance with MD WASD standards <br />and specifications not Metro Dade, which does require 2" to the wet <br />well. <br /> <br />06/08 <br /> <br />00900-1 <br /> <br />05-4893 <br />
The URL can be used to link to this page
Your browser does not support the video tag.