Laserfiche WebLink
<br />Atlantic Isles Roadway and Utility Improvements <br /> <br />Bid Estimated <br />Item Description Quantity Unit Unit Price Estimated Total <br />30 Furnish & Install 18" RCP drainage pipe complete <br /> (including but not limited to excavation, bedding, <br /> backfill, compaction & restoration as per plans &2.:': $ 1.0, , r;Q. !.-' <br /> and specifications) 325 LF $ <br />31 Furnish & Install 24" RCP drainage pipe complete <br /> (including but not limited to excavation, bedding, <br /> backfill, compaction & restoration as per plans <br /> and specifications) 1,650 LF ~l. ~ $ 15/, 8tO . ':,) <br />32 Furnish & Install 30" RCP drainage pipe complete <br /> (including but not limited to excavation, bedding, <br /> backfill, compaction & restoration as per plans 130. ,;: $ Q3,lPOO. :.? <br /> and specifications) 720 LF $ <br />33 Ultralite Tideflex Check Valve 1 EA $ Il,OOO.> $ IZ,OOO.~ <br />34 Vortech-Model 5000 1 LS $ 40, coD.' $ 40, 000 . ". <br />E Sanitary Sewer System and Force Main per <br /> WASD Standards/SDec <br />35 F&I 8" PVC sanitary sewer complete (including <br /> but not limited to excavation, bedding, backfill, <br /> compaction & restoration as per plans and Q3. ;. .... <br /> specifications) 2,340 LF $ $ Zit, " W. <br />36 F&I 8" DIP sanitary sewer complete (including but <br /> not limited to excavation, bedding, backfill, <br /> compaction & restoration as per plans and <br /> specifications) 120 LF ~ $ ", 180 . :::. <br />37 F&I 10" PVC sanitary sewer complete (including <br /> but not limited to excavation, bedding, backfill, <br /> compaction & restoration as per plans and .. 1. =1- FIO. :: <br /> IO!> . , <br /> specifications) 270 LF $ $ <br /> , <br />38 F&I 12" PVC sanitary sewer complete (including <br /> but not limited to excavation, bedding, backfill, <br /> compaction & restoration as per plans and 108. ~ <br /> specifications) 45 LF $ $ 4 . KlPO. = <br />39 Sanitary drop manholes 48" dia. 1 EA $ ~~SD.;> $ e,qSD. ~ <br />40 Core drill existing manhole #24 1 EA $ 4 1-SO. )0 $ 4 150. ". <br /> $ C;,' et:;O. ~ I <br />41 Sanitary manholes 48" dia. 22 EA $ lU. ~D. =' <br /> . <br />42 F&I 6" DIP force main complete (including but not <br /> limited to excavation, bedding, backfill, <br /> compaction & restoration as per plans and $ 0g.;..!- <br /> specifications) 1,150 LF $ ::J.~. ZOO. :: <br /> . <br />43 F&I 8" DIP force main complete (including but not <br /> limited to excavation, bedding, backfill, <br /> compaction & restoration as per plans and $ 1"S :: ::' <br /> specifications) 50 LF $ 3,150. <br />44 Miscellaneous sanitary PVC fittings $ 4. SUO . .. $ 4-. SOO. ..!:S <br />1 LS <br />45 Miscellaneous DIP valves and fittings 1 LS $ 1- SOO. ::' $ 1-.5OO.:? <br /> I <br />46 F&I 6" sanitary services laterals complete <br /> (including but not limited to excavation, bedding, <br /> backfill, compaction & restoration as per plans <br /> and specifications) 1,05D. .. $ {'S. IOD. :- <br /> 62 EA $ <br />47 F&I 6" Force main bridge crossing as per detail on 300. ;: ;J <br /> addendum (Bridge No. A) 63 LF $ $ 18'.QOO. <br />48 F&I 6" Force main bridge crossing as per detail on I~. 3ot>.':" <br /> addendum (Bridge No. B) 51 LF $ 300. '; $ <br />05/08-Addendum NO.5 00300-3 05-4893 <br />