Laserfiche WebLink
<br />Atlantic Isles Roadway and Utility Improvements <br /> <br />Bid <br />Item <br /> <br />Description <br /> <br />F Lift Station <br />49 Complete as per plans to include but not limited <br />to labor, equipment, materials, electric, <br />mechanical, earthwork, etc <br /> <br />G Pavement Marking, Striping and Signage <br />50 18" yellow solid line <br />51 18" white solid line <br />52 24" stop bar <br />53 6" double yellow <br />54 8" white 10'-30' skip <br />55 8" white solid line <br />56 RPM amberlamber <br />57 RPM bluelblue <br />58 R5-1 (Do Not Enter) <br />59 R6-1 L (One Way) <br />60 R6-1 R (One Way) <br />61 R3-1 (No Right Turn) <br />62 R1-2 (Yield) <br /> <br />Subtotal-Civil <br /> <br />III. Electrical - Street Lighting <br />63 Furnish and install decorative light pole cost <br />64 Furnish and install decorative light fixture cost <br />65 Wiring of light fixtures <br />66 Copper wiring (As per Plans) <br />67 Furnish and install 2" schedule 40 PVC conduit to <br />include trenching (6" x 12" deep). backfill and <br />restoration <br />68 Handholes <br />69 Copper clad ground rods (5/8" dia x 10'L) <br />70 Panel & Meter Enclosure, including connection to <br />service point <br /> <br />Subtotal-Electrical <br /> <br />IV. North Miami Beach Water Main Installation <br /> <br />71 Mobilization, General Conditions (Only for items in <br />IV Installation of Water Main System) <br /> <br />72 Abandonment I Removal of Existing Water <br />System <br /> <br />73 Install 8" PVC Pipe C-900 <br /> <br />74 Install 6" PVC Pipe C-900 <br /> <br />75 Install 4" Polyethylene Casing Pipe <br /> <br />76 Install 2" Polyethylene Casing Pipe <br /> <br />77 SS straps <br /> <br />78 Install Fire Hydrants <br /> <br />05/08-Addendum NO.5 <br /> <br />Estimated <br />Quantity Unit <br /> <br />76 <br />290 <br />18 <br />122 <br />0.50 <br />351 <br />85 <br />6 <br />3 <br />1 <br />3 <br />1 <br />1 <br /> <br />33 <br />33 <br />33 <br />16,000 <br /> <br />4,000 <br />33 <br />33 <br /> <br />1 <br />2,560 <br /> <br />420 <br /> <br />85 <br />770 <br />10 <br />6 <br /> <br />00300-4 <br /> <br />Unit Price <br /> <br />LS $ I E6 000. :: <br /> <br />LF $ 3. .39 <br />LF $ 3. 19 <br />LF $ 4. 49 <br />LF $ 1. ~ <br />GM $ 10.031.... <br />LF $ I.~ <br />EA $ v,.:'" <br />EA $ ~. :' <br />EA $ '2,QS.:1 <br />EA $ ZC}S. · <br />EA $ 2~S.:l <br />EA $ l.~S.'" <br />EA $ 1.'1$." <br /> <br />EA $ 4 J SO, ':' <br />EA $ 4. I so.;" <br />EA $ I, 1-50.-- <br />LF $ 3. ~ <br /> <br />LF $ I 'Z. 49 <br />EA $ 440.:J <br />EA $ I 6 S. :..' <br /> <br />LS $ \\ I ODD. ::> <br /> <br />LS <br /> <br />$ ]PI ODD. ;. <br /> <br />LS <br />LF <br /> <br />LF <br /> <br />LF <br />LF <br />EA <br />EA <br /> <br />, <br />$ IS.OOO. <br />$ ~4,::' <br />$ Sq. :: <br /> <br />$ 54. ;; <br />$ l.Df. :;. <br />$ ~,SOO.;" <br />$ 1, 'i SO. r: <br /> <br />Estimated Total <br /> <br />~ <br />$ 19)5, COO. <br /> <br />$ 250. ~ <br />$ t; S':f. :: <br />$ ?-Ct. ~ <br />$Zfli'.~ <br />$ t;. Oltp...:' <br />$ C;.~~.19 <br />$ 51O.::J. <br />$ .3lP. p <br />$ ggs. :J <br />$ zt:)~:J <br />$ ees. :> <br />$ Z4'JS.~ <br />$ z."'7s. ~ <br /> <br />$ L,on 014. ?B. <br />I <br /> <br />$ 1,3(,.,. CfSO. ~ <br />$ ,~/~,.::s <br />$ S "+ ~5o. ~ <br />$ 52:000. :: <br /> <br />$ 4Q. (PO/). - <br />$ '4~SlO.~ <br />$ ~, IDS..::" <br /> <br />$ " , 000. ;. <br /> <br />~ <br /> <br />$ 20, oou. :: <br /> <br />b <br />$ IS. 000. <br />$ I f.I,~. S'4V. ~ <br />$ 24.1W. :; <br /> <br />$ 4, se,D. ~ <br />$ 7. z., 330 . .::- <br />$ 2S~ 000. a <br />$ Ilj toO.';" <br /> <br />05-4893 <br />