Laserfiche WebLink
<br /> Atlantic Isles Roadway and Utility Improvements <br /> Bid Estimated <br />Item Descri tion Quantity Unit Unit Price Estimated Total <br />I. General <br /> 1 Mobilization and Demobilization (< 5 %) LS $ 20,000.00 $ 20,000.00 <br /> 2 MOT, per FOOT including temporary striping and <br /> signage, barricades, barriers, arrow panels, etc, as $ 30,000,00 <br /> required, LS $ 30,000,00 <br /> Subtotal-General $ 50,000.00 <br />II. Civil <br />A Demolition I Site Preparation <br /> 3 Asphalt pavement demolition/hauling and disposal LS $ 7,300.00 $ 7,300.00 <br /> 4 Driveway demolition/Hauling and disposal LS $ 58,000.00 $ 58,000.00 <br /> 5 Drainage structures to be removed or abandoned <br /> in place and filled with flowable fill LS $ 25,000.00 $ 25,000.00 <br /> 6 Relocate or adjust existing street signs LS $ 1.000.00 $ 1,000.00 <br /> 7 Remove power / light poles LS $ 1 nnn nn $1.000.00 <br /> , <br /> 8 Relocate existing mailboxes LS $ 8 "i00 00 $ 8,500.00 <br />B Earthwork <br /> 9 Green areas in R/W, including fine grade swales <br /> and sod (between back of curb & R/W) LS $ 18,000.00 $ 18,000.00 <br /> 10 Roadway earthwork LS $ 30.000 00 $ 30,000.00 <br />C Paving <br /> 11 Asphalt type, FC 12.7, 2.0 inches 8,400 SY $ 15.00 $1/6 000 nn <br /> 12 8" Iimerock base 10,000 SY $ 9.50 $95,000.00 <br /> 13 12" Stabilize sub-base material 11 ,000 SY $ 4.50 $ 49,500.00 <br /> 14 Select fill 3,350 CY $ 14.00 $46,900.00 <br /> 15 Driveway restoration (per detail on sheet C19) 2,150 SY $ 40.50 $ 87,075.00 <br /> 16 Type F curb and gutter 3,170 LF $ 10.32 $32,714.40 <br /> 17 Valley gutter 2,175 LF $ 10.32 $ 22,446.00 <br /> 18 Transition curb 500 LF $ 8.00 $ 4,000.00 <br /> 1 9 Concrete flume 6 EA $ 350.00 $1,750.00 <br /> 20 Flare end curb 4 EA $ 300.00 $ 1.200.00 <br /> 21 Pavement seam joint at bridge location 1 LS $ 1,000.00 $1,000,00 <br />D Drainage Structures and Piles <br /> 22 Curb drop inlets 22 EA $ 2.400.00 $<;780000 <br /> 23 Manhole Cover & Frame 2 EA $ 750.00 $1,500.00 <br /> 24 Catch basin Type E 3 EA $ 3,100.00 $ 9,300,00 <br /> 25 Catch basin Type D 8 EA $ 2,700.00 $ 21.600,00 <br /> 26 Catch basin Type C 14 EA $ 2,350.00 $ 32,900.00 <br /> 27 Control structures 1 LS $ 9,736.00 $9,736.00 <br /> 28 Pollution retardant baffles 26 EA $ 250.00 $ 6,500,00 <br /> 29 Furnish & Install 15" RCP drainage pipe complete <br /> (including but not limited to excavation, bedding, <br /> backfill, compaction & restoration as per plans <br /> and specifications) 770 LF $ 33.00 $ 25,410.00 <br /> <br />~ <br /> <br />05/08-Addendum No.5 <br /> <br />00300-2 <br /> <br />05-4893 <br />